Tender Value
₹21.7 L
EMD Value
₹22,000
Closing Date
18 Sept 2026, 6:00 pmClosed
Executive Engineer, Surat Canal Division, Surat
Extension of Drainage Syphon and Restoration Embankment of canal Slope on LHS of Surat Branch canal At 42.16 RD
341597
NIT 03 of 2026-27
Open
Civil - All
Works
Surat
15 documents required · 8 mandatory · 7 optional
₹900
Executive Engineer, Surat Canal Division, Surat
₹22,000
3 Sept 2026
3 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Name of Work : Extension of Drainage Syphon and Restoration Embankment of canal
Slope on LHS of Surat Branch canal At 42.16 RD
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item QTY. ITEM Rate UNIT AMOUNT
1 500.00 Clearing the canal land width including 14.60 Rupees SM
removing the shrub, bushes, cactus, weeds Fourteen and
other vegetation including cutting down Sixteen Paisa
trees upot 0.50cm girth and depositing the only
removed materials outside the canal land
width up to lead of 50 meter as directed etc.
complete.(Without water pool)
2 2.19 Dismentalling the R.C.C. work & 1747.70 Rupees one CM
disposing off the stuff including thousand seven
stacking of the useful materials etc. hundred fourty
complete as directed. seven and
(a) Light reinforcement. (Main bar up to seventy paisa
16 mm dia.) only
3 273.00 Desilting of various structures of canals 233.00 Rupees two CM
and distribution system including hundred thirty
depositing the same as directed with all three only
leads and lifts.
4 133.28 Excavation for foundation in all sorts of soil 81.50 Rupees eighty CM
including yellow, sandy, gravelly soil, soft one and fifty
and hard murrum etc. dry condition paisa only
including depositing the excavated stuff in
uniform layers in banks or as directed etc.
complete for lead up to 1.0 km and lift.( By
machinery)( a ) Above water table
5 59.70 Supplying & Laying trap rubble stone 20 1049.20 Rupees one CM
to 50 Kg. in weiight for toe and core thousand fourty
filling including coveying and stacking nine and twenty
to required line level Slopes section paisa only
including all leads and lifts. Conveying
material from stacks and laying
6 14.93 Providing and laying local sand in canal 549.90 Rupees five CM
section before laying R.C.C. Trough for lead hundred and
up to 10.0 K.M. and all lifts. ninty paisa only
7 28.45 Providing and laying plain/ reinforced 4380.90 Rupees four CM
Design Mix cement concrete of thousand three
various grade with cement, sand and hundred eighty
coarse aggregates including centering, and ninty paisa
shuttering, batching, mixing, transporting, only
placing, vibrating, smooth finishing, curing
etc. complete for all lead and
lift.(Baching Plant Based, Including
10(B) Raft, Bottom slab of barel, footing
of columns, piers, abutment and bottom slab
8 116.00 Providing and placing in position 7194.00 Rupees seven Qtl.
reinforcement bars including cutting, thousand one
bending welding, joints where necessary, hundred ninty
hooking etc. complete as per drawing for four only
all lead and lifts.
9 Providing and laying plain/ reinforced
Design Mix cement concrete of
various grade with cement, sand and
coarse aggregates including centering,
shuttering, batching, mixing, transporting,
placing, vibrating, smooth finishing, curing
etc. complete for all lead and
lift.(Baching Plant Based, Including
112.64 10 (D) Walls of barrels, brestwall, 5753.60 Rupees five CM
staunching rings, pedestals of bearing, thousand seven
stoplog piers, well staining, transitionwall, hundred fifty
etc. (iii) M-25 grade. three and sixty
18.21 10 (C) Piers, abutment, wingwalls, headwall, 4976.90 Rupees four CM
returnwall etc. (iii) M-20 grade. thousand nine
hundred seventy
10 60.00 Providing and fixing in position 110 mm dia 263.70 Rupees two Rmt.
PVC pipe weep holes in abutment, wing hundred sixty
wall, and laying training etc. complete three and
11 415.50 Earthwork in embankment using selected 118.10 Rupees one CM
soil,soft & hard murrum excavated from hundred
approved borrow area / village tanks etc eighteen and ten
including breaking clods , dressing to the paisa only
design section with lead up to
Kilometer and all lifts. (By poclane
12 415.50 Compaction of selected soil/hard 10.40 Rupees ten and CM
murrum/soft murrum in even thickness fourty paisa
of 15 to 20 cms including watering only
rolling of suitable capacity etc. complete
13 50.00 Providing and Erecting a "W" metal 4864.70 Rupees four Rmt.
beam CRASH BARRIER comprising of thousand eight
3 mm thick corrugated sheet metal beam hundred and
rail, 70 cm above road/ground level fixed sixty four and
on ISMC series channel vertical post,150 x seventy paisa
75 x 5 mm space 2.00 m centre to only
centre 1.80 m high 1.10 m below
ground/road level fixing at site shall be in
C.C. M-20 block of size 50 x 50 x100 cms
for each post. All steel parts and
fitments to be galvanized by hot dip
process, all fitting to conform IS: 1367 and
IS: 1364 metal beam rail to be fixed on the
vertical post with a spacer of section 150 x
75 x 5 mm 3.30 m long complete as per
MORTH Clause 810.Rates including
providing and fixing 3 mm thick ACM type
reflactor 100 mm wide, type 4, class-B,
High inensity grade sheeting between two
'W' metal beam throught and reflactive
unit at the top of vertical post as per
IRC:67-2012 etc. complete as per detailed
drawing and directed by engineer-in-
charge.(Metal beam crash barrier for
Rupees Twenty one Lac Sixty Six thousand Seven hundred Fifty and Twenty Four paisa only.
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour Cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R.
therefore, in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate i.e. Rs 5234/MT mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer Executive Engineer
Dam Sub Division Surat Canal Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Extension BOx 42 RD Surat Branch.pdf
BOQ Extension 42 RD.pdf
Drawing Extension 42 RD.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .