| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹3.5 L (2.88%)Admitted-Finance HANUTHANG | HANUMAKONDA | TELANGANA | 505101 | ₹1.3 Cr+₹3.5 L (2.88%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹21.1 L (17.2%)Admitted-Finance | ₹1.4 Cr+₹21.1 L (17.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹23.3 L (18.9%)Admitted-Finance MINJEE PROPER THANG MINJEE KARGIL KARGIL KARGIL LADAKH 194105 | KARGIL | LADAKH | 194105 | ₹1.5 Cr+₹23.3 L (18.9%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 Cr+₹26.6 L (21.6%)Admitted-Finance | ₹1.5 Cr+₹26.6 L (21.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS SYED SHABIR SHAH L3 | NUN KUN STC ENGINEERING OPC PVT LTD L4 | Saira Banoo L5 | M/S FIDA GROUP OF INDUSTRIES & CONSTRUCTION CO. L1 | M/S SHAH AND SHAH CONSTRUCTION L6 | M/S MOHD HUSSAIN L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||||||
| 1.01 | All kinds of soil 70% | 10,227.87 | Cum | 110 ₹11,25,065.7 | 170 ₹17,38,737.9 | 150 ₹15,34,180.5 | 100 ₹10,22,787 | 170 ₹17,38,737.9 | 90 ₹9,20,508.3 Lowest |
| 1.02 | Ordinary rock 10% | 1,461.12 | Cum | 220 ₹3,21,446.4 | 320 ₹4,67,558.4 | 250 ₹3,65,280 | 150 ₹2,19,168 Lowest | 400 ₹5,84,448 | 270 ₹3,94,502.4 |
| 1.03 | Hard Rock (RB) 20% | 2,922.25 | Cum | 400 ₹11,68,900 | 630 ₹18,41,017.5 | 500 ₹14,61,125 | 400 ₹11,68,900 | 600 ₹17,53,350 | 300 ₹8,76,675 Lowest |
| 2.00 | Dumping /filling of stone in horizontal on level excluding cost of stone but including all carriage complete. | 101.25 | Cum | 100 ₹10,125 Lowest | 750 ₹75,937.5 | 150 ₹15,187.5 | 200 ₹20,250 | 600 ₹60,750 | 120 ₹12,150 |
| 3.00 | Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing and all carriage complete.. | 1,815.75 | Cum | 5,500 ₹99,86,625 | 4,500 ₹81,70,875 | 4,800 ₹87,15,600 | 3,800 ₹68,99,850 Lowest | 5,100 ₹92,60,325 | 5,000 ₹90,78,750 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) including all carriage complete.. | 24 | Cum | 6,000 ₹1,44,000 | 6,300 ₹1,51,200 | 4,800 ₹1,15,200 Lowest | 6,000 ₹1,44,000 | 6,000 ₹1,44,000 | 5,000 ₹1,20,000 |
| 5.00 | Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job | 3,830 | Sqm | 150 ₹5,74,500 | 180 ₹6,89,400 | 100 ₹3,83,000 Lowest | 100 ₹3,83,000 Lowest | 200 ₹7,66,000 | 140 ₹5,36,200 |
| 6.00 | Filling of avalable excavated earth (excluding rock) in trenches plinth ,side s of foundation etc. layers not exceeding 20Cm in depth ,consoloadating each deposited layer by ramming and watering lead upto 50mtr and lift upto i.5 mtr | 1,875 | Cum | 150 ₹2,81,250 | 180 ₹3,37,500 | 200 ₹3,75,000 | 200 ₹3,75,000 | 135 ₹2,53,125 | 60 ₹1,12,500 Lowest |
| 7.00 | Disposal of excavated surplus earth /Mulba for an average lead upto 03 Km by MT | 7,641.75 | Cum | 100 ₹7,64,175 | 150 ₹11,46,262.5 | 250 ₹19,10,437.5 | 200 ₹15,28,350 | 110 ₹8,40,592.5 | 70 ₹5,34,922.5 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
15 Nov 2024, 4:00 pmClosed
Executive Engineer I and F C Division Kargil
Executive Engineer I and F C Division Kargil
Channelization and concrete Protection work along Sangrah Nallah from ( RD-750-1000 Mtr ) Under the project Construction of flood protection work along Sangrah nallah
2024_PWD_14869_4
Fresh e-Tender 26 of 2024-25-I-FC Kargil
Open Tender
Civil Works - Canal
Works
375 days
Sangrah Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,800
Payable To Executive Engineer I and F C Division K
₹3.7 L
2 Dec 2024
6 Nov 2024
16 Nov 2024
6 Nov 2024
15 Nov 2024
6 Nov 2024
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil 70%
Ordinary rock 10%
Hard Rock (RB) 20%
Dumping /filling of stone in horizontal on level excluding cost of stone but including all carriage complete.
Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing and all carriage complete..
Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) including all carriage complete..
Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job
Filling of avalable excavated earth (excluding rock) in trenches plinth ,side s of foundation etc. layers not exceeding 20Cm in depth ,consoloadating each deposited layer by ramming and watering lead upto 50mtr and lift upto i.5 mtr
Disposal of excavated surplus earth /Mulba for an average lead upto 03 Km by MT
Design securing depth,R-wall and Training dully vetted by NIT Srinagar complete Job
M/S MOHD HUSSAIN (BID ID -141350)
MS SYED SHABIR SHAH (BID ID -141164)
NUN KUN STC ENGINEERING OPC PVT LTD (BID ID -141340)
Saira Banoo (BID ID -141454)
M/S SHAH AND SHAH CONSTRUCTION (BID ID -141335)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_36855.xls
BOQ • 0.34 MB
SBD-sangrah-Nallah-Protec_Bund_183.52.pdf
Additional Documents • 1.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .