Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹80 L
Closing Date
25 Oct 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RandB Division Ganderbal
Office of Executive Engineer RandB Division Ganderbal
Name of Scheme Construction Upgradation of Wani Mohalla Bala Pati road Phase Under NABARD RIDFName of Work Balance work of Wani Mohalla Balapati PhaseII bwo PL WBM GII GIII Macadamization PCC Protection Walls Crate walls CC Drain at requ
2021_PWDJK_144274_1
NIT188-2021-22
Open Tender
Civil Works
Item Rate
365 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹1,600
Yes
Executive Engineer RandB Division Ganderbal
Exempted
27 Oct 2021
18 Oct 2021
27 Oct 2021
18 Oct 2021
25 Oct 2021
18 Oct 2021
120 days
Amount
(A) Construction Of Cement Concrete Concrete Drain
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil
P/L, of stone soling 75 mm nominal size duly hand packed with ramming, dressing, watering and compacting complete job.
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to floor V-level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) complete.
Providing and laying in position cement concrete of specified grade excld. the cost of centering and shuttering all work upto floor V- level 1:2:4 (1 cement: 2 coarse sand: 4 graded stone agg. 20mm nominal size (crushed) for Drains icomplete.
P/L, in position reinforced cement concrete of specified grade of M-20 excluding the cost of centering & shuttering in 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size (Crushed) in RCC slab, stair,raft strip etc all complete.
Reinforcement for R.C.C work incld straightening, cutting, bending, placing in position and binding all complete:- (Thermo Mechanically Treated Bars.) Tar steel (TMT) shall be provided from Divisional Store on existing stock rates.
Centering and shuttering incld. strutting ,propping etc. and removal of form work in foundation footings, suspended floors,Surfaace Drain etc complete.
12mm thick cement plaster in 1:4 mix (1 cement 4 sand) incl. carriage complete.
50mm cement concrete flooring in 1:2:4 (1 cement: 2coarse sand: 4 graded stone agg., 20mm nominal size finished with a floating coat of neat cement slurry incl. carriage complete.
(B) Construction Of R/Wall
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil
P/L, of stone soling 75 mm nominal size duly hand packed with ramming, dressing, watering and compacting complete job
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to floor V-level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) complete job.
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to Floor V- level in 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate of 20 mm Nominal size (Crushed) 20% plum complete job.
Centering and shuttering incld. strutting ,propping etc. and removal of form work in foundation footings, suspended floors,R/Wall, etc complete job.
Supplying, stacking and filling of Granular Material behind R/Wall including spreading, watering, dressing and ramming in 15/22 cm layers and consolidation with D.R.R of 08-10 tonne capacity to the required gradient and camber complete job.
Providing and fixing of crate wall by knitting crates and filling stones from lacal source complete.
Engagement of JCB Machine for surface treatment of Nallah complete.
(C) Vented Causeway
Vented Causeway excavation and treatment of nallah bed, incl. maintaining proper longitudinal alignment of nallah incl. dewatering etc complete
P/L, of stone soling 75 mm nominal size duly hand packed with ramming, dressing, watering and compacting complete job
P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to Floor V- level in 1:3:6 (1cement: 3 coarse sand: 6 graded stone aggregate of 20 mm Nominal size (Crushed) complete.
Providing and laying in position cement concrete of specified grade excld. the cost of centering and shuttering all work upto floor V- level 1:2:4 (1 cement: 2 coarse sand: 4 graded stone agg. 20mm nominal size (crushed) complete.
P/L, in position reinforced cement concrete of specified grade of M-20 excluding the cost of centering & shuttering in 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size (Crushed) in Walls (any thickness0, stair,raft strip etc all complete.
Reinforcement for R.C.C work incld straightening, cutting, bending, placing in position and binding all complete:- (Thermo Mechanically Treated Bars.)Tar steel (TMT) shall be provided from Divisional Store on existing stock rates.
Centering and shuttering incld. strutting ,propping etc. and removal of form work in foundation footings, suspended floors,Toe Wall, Slab etc complete job.
Back Filling of Granular Material/nallah boulders including spreading, watering, dressing and ramming in 15/22 cm layers and consolidation with D.R.R of 08-10 tonne capacity to the required gradient and camber complete job.
Providing/ laying and embedding of R.C.C spun pipes of incld. trench excavation in all status of surface to required width/depth and making of necessary cushioning with required material jointing of pipes all inclusive incl. carriage of pipes from Divisional Store upto site of work complete incl. cost of Pipes (Pipes shall be provided from Divisional Store on existing stock rates). 36" dia RCC pipes
Carriage of materials by mechaanical transport from source to site of work incl. loading and unloading complete.
Stone aggregate 40mm & above for an average lead of 18 Kms.
Sand for an average lead of 08 Kms
Clearance of slips by mechnical means in all kinds of soil, Kankar, Boulder, Granular Material complete.
Earth work in bulk excavation in all kinds of soil by mechnical means including dressing and leveling of ground with all leads, lifts, disposal of excavated material as per the directions of engineer incharge.
Supply, stacking and laying of WBM grade 2nd with specified graded stone aggregate 63mm - 45mm size broken quarry stone @0.92cum/10 sqm and using of screening 11.20mm size @ 0.135cum/10sqm and binding material @0.06cum/10sqm of road surface including sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid.
Supply, stacking and laying of WBM grade 3rd with specified graded stone aggregate 53mm – 22.40mm size broken quarry stone @0.92cum/10 sqm and using of screening 11.20mm size @ 0.135cum/10sqm and binding material @0.06cum/10sqm of road surface including sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid.
(D) Pavements
Providing and applying tack coat using hot straight run bitumen of V-G 10 Grade on the prepared surface and cleaned with hydraulic broom as per technical specification clause 503 of MOST specifications incld. Carriage of materials loading, unloading incld. All taxes involved on account of labour and material incld. cost of bitumen.
On WBM surface @0.75kg/sqm.
Providing and laying 50mm thick compacted bituminous macadam using hot straight run Bitumen of V-G 10 Grade @3.3% by weight and pre-mixed with hot mix plant using crushed agg.as specified premixed with bituminous binder laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with viberator/road rollers to achieve the desired compaction conforming to MOST specifications incl. all loading, un-loading and all carriages of materials involved upto site of work all allied machinery, cost of bitumen completeBut excluding the cost of Tack cat.
Providing and laying 25mm thick semi-dense bituminous concrete surfacing for wearing course composed of agg. of specified grade with bituminous binder 5% of weight by total mix using hot straight run bitumen of V-G 10 grade (@2.88Kgs/sqm of road surfaceand pre-mixed with hot mix plant ) mixing in suitable hot mix plant laying with paver finisher with electronic sensing device to required grades, levels and alignment and rolling with road rollers to achieve the desired compaction conforming to MOST specifications including cost and carriages leads, lifts, loading, unloading of all materials involved upto site of work complete, and all carriages of materials involved upto site of work all allied machinery, incld. cost of bitumen complete.
Providing and laying 6mm thick seal coat of premixed fine aggregate using hot straight run bitumen (@ 0.768kgs/sqm of road surface) incld. mixing in the hot mix plant laid with paver finisher fitted with electronic sensing device to required grades, levels and alignment and rolling with road rollersto achieve the desired compaction as per MOST specificatiincl. all loading, un-loading and all carriages uptosite of work including cost of Bitumen complete.
SHEIKH BUILDERS
M/S ALI MOHD SOFI
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .