| Sl No | Description | Qty | Unit | KR CONSTRUCTIONS L2 | J.Jayalalitha L1 |
|---|---|---|---|---|---|
| 1.00Name of the works | |||||
| 1.01 | Clearing the damaged Precast RCC cover slab including all labour charges, lead, lift etc complete. | 23 | m2 | 480 ₹11,040 | 501 ₹11,523 |
| 1.02 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 2 | m3 | 7,850 ₹15,700 | 7,001 ₹14,002 |
| 1.03 | Plastering the surface of Cable duct walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers. | 9 | m2 | 290 ₹2,610 | 301 ₹2,709 |
| 1.04 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. (For precast cover slab.) | 19 | m3 | 15,360 ₹2,91,840 | 15,001 ₹2,85,019 |
| 1.05 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire etc complete complying with standard specification. | 970 | Kg | 93 ₹90,210 | 71 ₹68,870 |
| 1.06 | Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete. | 873 | Nos | 90 ₹78,570 | 51 ₹44,523 |
| 1.07 | White washing one coat with freshly burnt white shell lime in all floors including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers. | 230 | m2 | 20 ₹4,600 | 101 ₹23,230 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
23 Jan 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
O/o SUPERINTENDING ENGINEER, KARUR ELECTRICITY DISTRIBUTION CIRCLE, KARUR.
Repair and Maintenance of the Andichettipalayam 110 /33/11KV Sub station by providing precast RCC cover slab for the cable trenches etc at Andichettipalayam in Karur
2026_EB_640709_1
SPEC 08/25-26 DT 07.01.2025
Open Tender
Civil Works
180 days
KARUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
10 Mar 2026
8 Jan 2026
27 Jan 2026
8 Jan 2026
23 Jan 2026
8 Jan 2026
Name of the works
Clearing the damaged Precast RCC cover slab including all labour charges, lead, lift etc complete.
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Plastering the surface of Cable duct walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. (For precast cover slab.)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire etc complete complying with standard specification.
Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete.
White washing one coat with freshly burnt white shell lime in all floors including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers.
Tender floated for the whole event.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_767299.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid