| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC 96 BARTHAKUR MILL ROAD ULUBARI KAMRUP ASSAM 781007 | KAMRUP METRO | ASSAM | 781007 | ₹3.3 L Quoted ₹2.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.1 L+₹27,900 (9.72%)Rejected-AOC 6 NO BIJOY NAGAR SAI TOWER NAIHATI NAIHATI GARIFA WEST BENGAL 743165 UDYAM WB 14 0004481 | 24 PARAGANAS NORTH | WEST BENGAL | 743165 | ₹3.1 L+₹27,900 (9.72%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.0 L+₹1.1 L (38.6%)Rejected-AOC | ₹4.0 L+₹1.1 L (38.6%) | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical The bidder failed to submit the shortall documents as such found to be technically non responsive |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
1 Dec 2023, 12:00 pmClosed
CGM PPnD
CGM PPnD, Oo MD, AEGCL, First Floor, Bijulee Bhawan, Guwahati
Geotechnical Investigation for construction of 1 nos of 132 kV Grid Substation at Missamari under AEGCL
2023_AEGCL_32859_1
AEGCL/MD/Tech-1028/MMS/SI
Open Tender
Electrical Works
Works
90 days
Missamari
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹6,000
16 Mar 2024
9 Oct 2023
4 Dec 2023
9 Oct 2023
1 Dec 2023
9 Oct 2023
Amount
Mobilization & Demobilization of team & Equipment to site and return
For the proposed Substation
Soil sample test in approved laboratory
Natural Moisture Content
Particle Size Analysis
Sieve
Mechanical Analysis
Index Properties ( Liquid & Plastic Limits, shrinkage & Plasticity index)
Bulk & Dry Density
Unconfined Compression Test
Shear Test by Triaxial Compression
Direct Shear Test
Consolidation test (Odometer)
Chemical analysis for
Sub-Soil water
Making Test Bores on soil including taking out undisturbed and disturbed soil samples, maintaining driving records of standard penetration test at various depths in soil and furnishing the necessary report and data in bore log form in sextuplicate to the engineer.
Upto 15m depth from natural ground level (15Mx 12 Nos. BH)
PLT- Conducting Plate Load Test including all necessary arrangements.
Earth Resistivity test with four point Megger.
Hydrometer Analysis
Standard Proctor Compaction Test
Relative Density (for sand)
California Bearing Ratio
Preparation and submission of report on soil investigation including recommendations as per specifications.
P.K.DUTTA AND CO.
RANILA ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .