| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.5 L+₹19,459 (3.07%)Rejected-AOC MELARCODE | MADURAI | TAMIL NADU | 625001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.2 L+₹87,479.88 (13.8%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | C.K.BABU L2 | GOPALAN.M L1 | HARIDASAN.M.V L3 |
|---|---|---|---|---|---|---|
| 1.00panampazhakadu cada | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 200 | sqm | 6.22 ₹1,244 | 6.03 ₹1,206 Lowest | 6.87 ₹1,374 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 44 | cum | 172.87 ₹7,606.28 | 167.72 ₹7,379.68 Lowest | 190.88 ₹8,398.72 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 33 | cum | 5,322.97 ₹1,75,658.01 | 5,164.31 ₹1,70,422.23 Lowest | 5,877.48 ₹1,93,956.84 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 440 | sqm | 259.11 ₹1,14,008.4 | 251.39 ₹1,10,611.6 Lowest | 286.11 ₹1,25,888.4 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 44 | cum | 5,749.89 ₹2,52,995.16 | 5,578.51 ₹2,45,454.44 Lowest | 6,348.88 ₹2,79,350.72 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | cum | 6,197.34 ₹30,986.7 | 6,012.62 ₹30,063.1 Lowest | 6,842.93 ₹34,214.65 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 280 | sqm | 230.68 ₹64,590.4 | 223.81 ₹62,666.8 Lowest | 254.71 ₹71,318.8 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 27.3 | cum | 213.69 ₹5,833.74 | 207.32 ₹5,659.84 Lowest | 235.95 ₹6,441.44 |
Tender Value
₹9.7 L
EMD Value
₹24,327
Closing Date
18 Aug 2025, 5:00 pmClosed
ASST EXECUTIVE ENGINEER
ASST EXECUTIVE ENGINEERCANAL SUB DIVISION ALATHUR
GENERAL-PLAN CHERAMANGALAM SCHEME 2025-26-09 Improvements and urgent rectification work to Panampazhakadu cada ch0 000 to 0 200 km starting from main canal ch 0 700 km
2025_Irrig_783296_1
25/IRR/PI/TR/2865/2025_5_11_10
Open Tender
Civil Works - Canal
Item Rate
360 days
ALATHUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,150
Yes
₹24,327
Yes
10 Sept 2025
12 Aug 2025
21 Aug 2025
12 Aug 2025
18 Aug 2025
12 Aug 2025
12 Aug 2025 - 17 Aug 2025
Amount
panampazhakadu cada
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
C.K.BABU (BID ID -2289182)
HARIDASAN.M.V (BID ID -2293042)
Bidder Name
C.K.BABU
GOPALAN.M
HARIDASAN.M.V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1285706.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .