Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | L1 | Accepted-Finance Due to lowest rate quoted by the firm | |
| 2 | L2₹3.5 L+₹17,620.87 (5.37%)Accepted-Finance | L2 | Accepted-Finance Due to 2nd lowest rate quoted by the firm |
Tender Value
₹3.2 L
EMD Value
₹6,408
Closing Date
1 Jul 2026, 12:00 pmClosed
AC(Works)/AE(Civil)
FTR HQ BSF South Bengal
As per BOQ
2026_BSF_913973_1
30/AE/SB FTR/2026-27
Open Tender
Civil Works
Percentage
75 days
Hasnabad
As per NIT
3 documents required · 3 mandatory
₹0
₹6,408
8 Oct 2026
20 Jun 2026
2 Jul 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below | 4 | each | 407.38 | ₹1,629.52 |
| 2 | Dismantling of flushing cistern of all types (C.I./PVC/Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. | 4 | each | 124.3 | ₹497.2 |
| 3 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge. | 4 | each | 148.77 | ₹595.08 |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm:For thickness of tiles 10 mm to 25 mm | 22.56 | sqm | 81.43 | ₹1,837.06 |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 54.81 | sqm | 60.62 | ₹3,322.58 |
| 6 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 0.73 | cum | 3,939.81 | ₹2,876.06 |
| 7 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 1.71 | cum | 2,285.61 | ₹3,908.39 |
| 8 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 0.74 | cum | 2,356.12 | ₹1,743.53 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.74 | cum | 7,557.34 | ₹5,592.43 |
| 10 | Providing and fixing PTMT grating of approved quality and colour.Circular type100 mm nominal dia | 4 | each | 41.71 | ₹166.84 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.04 MB
Tendernotice_2.pdf
PDF • 1.78 MB
Tendernotice_3.pdf
PDF • 3.68 MB
BOQ_960506.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .