| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-Finance | ₹12.7 L | L1 | Accepted-Finance LOWEST AMOUNT |
| 2 | L2₹12.7 L+₹291 (0.02%)Rejected-Finance | ₹12.7 L+₹291 (0.02%) | L2 | Rejected-Finance HIGEST AMMOUNT |
| 3 | L3₹12.7 L+₹7,301 (0.58%)Rejected-Finance | ₹12.7 L+₹7,301 (0.58%) | L3 | Rejected-Finance HIGEST AMMOUNT |
| 4 | L4₹12.9 L+₹20,197 (1.60%)Rejected-Finance HIMACHAL PRADESH HP | ₹12.9 L+₹20,197 (1.60%) | L4 | Rejected-Finance HIGEST AMMOUNT |
| 5 | L5₹13.5 L+₹82,860 (6.55%)Rejected-Finance VILLAGE BUDHAR PO ALOH TEHSIL RAKKAR DISTT KANGRA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 175013 | ₹13.5 L+₹82,860 (6.55%) | L5 | Rejected-Finance HIGEST AMMOUNT |
Tender Value
₹15.4 L
EMD Value
₹30,900
Closing Date
14 Sept 2023, 5:00 pmClosed
EE HPPWD DIVISION KOTLA BEHAR
EE HPPWD DIVISION KOTLA BEHAR
CONSTRUCTION OF SHANTLA TO PATHIAR ROAD KM 0.0 TO 2.0 SUB HEAD C.O 900MM DIA HUME HUME PIPE CULVERT AT RD 0.450 0.900.1.180.1.330 ALONG WITH WALL 4 NOS HUME PIPE CULVERT UNDER SCDP
2023_PWD_78313_1
TENDER NOTICE NO 2356-61 DATED 23.8.2023
Open Tender
Civil Works
Item Rate
120 days
KOTLA BEHAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹30,900
28 Sept 2023
4 Sept 2023
15 Sept 2023
4 Sept 2023
14 Sept 2023
4 Sept 2023
Amount
Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/ wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and backfilling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals.
Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete, in or under water in open foundation for all types of structures, including pumping or bailing out water/ dewatering (surface/sub-soil water) and including removal of slush which may arise at the time of laying under water for all heights/depth and any quantum of water including cost of form work and curing complete as per drawing and MORD technical specification 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade M-15 (M-Fifteen) Nominal mix 1:2½:5 (one cement isto two and half sand isto five graded crushed stone aggregate (40mm) forty millimeter nominal size) in open foundation or under water, including pumping or bailing out water/ dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water, for all heights/depths and any quantum of water, in open foundation etcetera including cost of form work and curing complete as per MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
Providing and laying (to level or slope) 900mm dia (Nine hundred millimeter) diametre reinforced cement concrete light duty non pressure pipes IS Class NP-2 for culverts on first class bedding or granular material in single row including fixing collar with cement mortar 1:2 (One cement isto two sand) but excluding the cost of excavation, protection works, back filling, pipe bedding concrete and masonry work in head walls and parapets as per drawing and M.O.R.D. technical specifications clause 1101.5 and as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidental. The rate including octroi, royality, Malkana, GST, toll tax, sale tax or other taxes imposed by the Government.
Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade-M20 (M-Twenty) Nominal mix 1:2:4 (one cement isto two sand isto four graded crushed stone aggregate (40mm) forty millimeter nominal size) in or under water in open foundation for all types of structure and the like in Catchpit flooring etcetera, including cost of form work and curing complete as per drawing and MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including pumping or bailing out water/dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water for all heights/depths and any quantum of water complete including carriage of materials up to all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
NAVEEN PARBHAKAR
lucky kapoor
PANKAJ KUMAR
ARVIND SINGH RANA
KARTAR SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .