Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | ₹11.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.5 LRejected-AOC | ₹12.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | N M SADANANDAN L1 | Benny. K.A L2 |
|---|---|---|---|---|---|
| 1.00Road renovation | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 169 | sqm | 14.94 ₹2,524.86 | 15.69 ₹2,651.61 |
| 1.00 | 3.7:Removal of Unsuitable Soil with Disposal upto 1000 m <br> Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 | 22.5 | cum | 51.02 ₹1,147.95 | 53.57 ₹1,205.33 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 174.17 | sqm | 399.27 ₹69,540.86 | 419.23 ₹73,017.29 |
| 1.00 | OD346342/2025-2026:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 15.21 | cum | 183.11 ₹2,785.10 | 192.27 ₹2,924.43 |
| 1.00 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. <br>(ii) Using Gravel mix soil. | 1.69 | cum | 2,319.8 ₹3,920.46 | 2,435.79 ₹4,116.49 |
| 1.01 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 25.35 | cum | 3,504.6 ₹88,841.61 | 3,679.83 ₹93,283.69 |
| 1.01 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 169 | sqm | 80.21 ₹13,555.49 | 84.22 ₹14,233.18 |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 169 | sqm | 18.76 ₹3,170.44 | 19.7 ₹3,329.30 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,162 | sqm | 15.65 ₹18,185.30 | 16.43 ₹19,091.66 |
Updated dates
Tender Value
₹11.9 L
EMD Value
₹29,652
Closing Date
21 Nov 2025, 5:00 pmClosed
RAJANI P P
Assistant Engineer Mattannur Muncipality
Mattannur Municipality 2025-26 295/26 Elakkuzhi palam Uravakkund road Renovation-General Civil Work
2025_LSGD_818831_1
AE/LSGD/MTNR/25-26
Open Tender
Civil Works - Roads
180 days
Mattanur
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹29,652
Yes
29 Apr 2026
4 Nov 2025
24 Nov 2025
4 Nov 2025
21 Nov 2025
4 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1372473.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1372473.xls
BOQ • 0.31 MB
sbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid