Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | L1 | Accepted-AOC Ist | |
| 2 | L2₹13.0 L+₹1.5 L (13.0%)Rejected-AOC | L2 | Rejected-AOC II nd |
| Sl No | Description | Qty | Unit | P. S. Sunil L2 | RAJEEV RAJU L1 |
|---|---|---|---|---|---|
| 1.00Construction of damaged culvert | |||||
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 3.2 | cum | 821.67 ₹2,629.34 | 727.1 ₹2,326.72 Lowest |
| 1.00 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | 26.4 | cum | 550.37 ₹14,529.77 | 487 ₹12,856.8 Lowest |
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 49.65 | cum | 66.93 ₹3,322.74 | 59.2 ₹2,938.98 Lowest |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 23.2 | cum | 7,767.74 ₹1,80,196.03 | 6,873.7 ₹1,59,456.09 Lowest |
| 1.00 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 1.5 | cum | 9,399.35 ₹14,099.03 | 8,317.53 ₹12,476.3 Lowest |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 45.44 | cum | 8,998.26 ₹4,08,916.93 | 7,962.6 ₹3,61,852.39 Lowest |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 16.44 | cum | 9,775.31 ₹1,60,706.1 | 8,650.22 ₹1,42,209.62 Lowest |
| 1.01 | 12.8.B:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M20 (Without formwork) | 7 | cum | 9,327.06 ₹65,289.42 | 8,253.57 ₹57,774.99 Lowest |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 2.99 | MT | 1,06,722.93 ₹3,19,101.56 | 94,439.73 ₹2,82,374.79 Lowest |
Tender Value
₹12.2 L
EMD Value
₹30,625
Closing Date
3 Oct 2025, 2:00 pmClosed
AEE
O/o AEE PWD Roads sub Division,PALA
SR 2025-26 Reconstruction of damaged culvert of Teekoy Thalanad Moonnilavu road nearch.5/600
2025_PWD_801517_1
PWD/RB/9114/2025-2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Melukavu
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹30,625
22 Oct 2025
24 Sept 2025
4 Oct 2025
24 Sept 2025
3 Oct 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .