| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC 1828 SFNO 433 PN ROAD PERMANALLUR TIRUPUR | ERODE | TAMIL NADU | 638051 | ₹2.2 Cr | L1 | Accepted-AOC LOA |
| 2 | L2₹2.2 Cr+₹1.1 L (0.49%)Rejected-Finance | ₹2.2 Cr+₹1.1 L (0.49%) | L2 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
19 May 2023, 3:00 pmClosed
The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Upgradation/ Strengthening of 1 nos Rural Roads in Natham Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 TN05-44
2023_RDTN_309382_1
DIPR/2018/Tender/2023 DINDIGUL DISTRICT
Open Tender
Civil Works
Item Wise
180 days
DINDIUGL DISTRICT
Upgradation/ Strengthening of 1 nos Rural Roads in Natham Block of Dindigul District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23 TN05-44
6 documents required · 6 mandatory
₹0
₹2.3 L
Yes
DRDA,DINDIGUL
13 Jul 2023
2 May 2023
19 May 2023
2 May 2023
19 May 2023
2 May 2023
15 May 2023
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soils, such as gravelly soil hard red earth shales, murrams gravel stoney earth and earth mixed with 50% lair sized boulders and hard gravel soil exept sand and hard rock requiring blasting as per SS 20A (Box cutting)
Picking the existing old metal for the B.T. surface and sectioning the undulations and all compacting charges etc., complete
Providing and Laying Gravel to a compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM/WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete with 100 - 120 TPH batch type HMP Producing an average output of 75 tonne per hour using Crushed Aggregates of specified grading, primixed with Bituminous binder at 5.4 tp 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqired grade, level and alignment, rolling with smooth wheeled, Vibratory and tanam rollers to acheive the desired compaction as MORT & H
Construction of Culvert @ Chainage 240m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill & Above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of Culvert @ Chainage 540m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill & Above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of Culvert @ Chainage 2050m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill & Above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of Culvert @ Chainage 3540m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill & Above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of Culvert @ Chainage 3890m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill & Above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of Culvert @ Chainage 4290m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill & Above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of Retaining wall @ Chainage 4290
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth etc, complete
Cemant Concrete 1:4:8(One Cement four Sand and Eight Hard Broken Stone) Using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Providing and fixing of KM stones for standard specification
Providing and fixing of HM stones for standard specification
Providing and fixing of Name board cum Citizen board
Providing 60cm Equlaterial Traingle cautionary sign board
Provision 60cm Circle board
Road markin with Hot applied Thermoplastic compond with Reflecoring class beads on Bituminous surface
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S.RAVI CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .