Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAccepted-AOC ALAPPUZHA | ALAPPUZHA | KERALA | 686534 | ₹43.5 L | L1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | VARGHESE ANTONY L1 |
|---|---|---|---|---|
| 1.00CIVIL WORKS | ||||
| 1.00 | 2.32 Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 200 | sqm | 9 ₹1,800 |
| 1.00 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 69.18 | cum | 359 ₹24,835.98 |
| 1.00 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 14.67 | cum | 7,932 ₹1,16,386.24 |
| 1.00 | 5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 28.28 | sqm | 386 ₹10,914.54 |
| 1.00 | 5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 98.11 | sqm | 762 ₹74,759.06 |
| 1.01 | 5.9.7 Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings) except spiral - staircases) | 18.36 | sqm | 824 ₹15,128.64 |
| 1.01 | 5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 163.84 | sqm | 961 ₹1,57,455.05 |
| 1.01 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 4,698.15 | kilogram | 112 ₹5,26,192.8 |
| 1.01 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 27.94 | sqm | 10,488 ₹2,93,024.23 |
Tender Value
₹43.6 L
EMD Value
₹50,000
Closing Date
15 Nov 2025, 12:30 pmClosed
Managing Director
KHRWS, General Hospital Campus, Red cross Road, Tvpm - 695035
NHM - Constructionof New Building for SC Paral, Kottayam District - Civil and Electrical works
2025_KHRWS_789844_3
27/2025-26/KHRWS
Open Tender
Civil Works - Buildings
240 days
Paral
Registration certificate of KHRWS
8 documents required · 8 mandatory
₹2,500
₹50,000
20 Feb 2026
4 Nov 2025
17 Nov 2025
4 Nov 2025
15 Nov 2025
4 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Agreementformat.pdf
Tender Documents • 0.10 MB
Tender_conditions_2019revisedlatest.pdf
Additional Documents • 0.34 MB
RevisedGeneralConditionsforeTendering.pdf
Other Document • 0.32 MB
MOUCivilElectrical.pdf
Other Document • 0.12 MB
BOQ_1372588.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid