| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹1.1 Cr | L1 | Accepted-AOC Work has been completed |
| 2 | L2₹1.1 Cr+₹6.6 L (6.24%)Rejected-Finance V P O SALEHRA TEH BAIJNATH DISTT KANGRA H P | ₹1.1 Cr+₹6.6 L (6.24%) | L2 | Rejected-Finance Reject |
| 3 | L3₹1.1 Cr+₹8.5 L (8.09%)Rejected-Finance | ₹1.1 Cr+₹8.5 L (8.09%) | L3 | Rejected-Finance Reject |
| 4 | L4₹1.2 Cr+₹13.5 L (12.8%)Rejected-Finance | ₹1.2 Cr+₹13.5 L (12.8%) | L4 | Rejected-Finance Reject |
| 5 | L5₹1.3 Cr+₹28.4 L (27.0%)Rejected-Finance S O SH RAMESH KUMAR VILLAGE PASSAR PO BALH KAWAR TEHSIL LAD BHAROL DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹1.3 Cr+₹28.4 L (27.0%) | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Lalit Pal L5 | Naveen Kumar L1 | AMIT KATOCH L4 | VIJAY KAPOOR L3 | KARUN KUMAR L2 | VIPAT RAM L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations and trenches including pipes and pits in all depths etc. in all lifts and in all kinds of soils such as pick work, jumper work, blasting in soft/ hard rock, chiseling/wedging out of rock (where blasting is prohibited) and saturated soils, stacking the excavated earth within all leads and lifts, clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths, sides of foundations and trenches etc.. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by Engineer in-charge within all leads and lifts including uprooting of trees, dressing of beds and sides and preparation of sub-grade, restoration of unmetalled/ metalled/ paved surfaces to its original conditions(excluding cost of mettaling tarring and concreting including shoring, strutting, "mbering and dewatering, where ever required, providing diversion for traffic, fixing night signals, fixing caution boards, crossing over trenches for access to houses complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 70.17 | Cubic Meter | 313 ₹21,963.21 | 300 ₹21,051 Lowest | 399 ₹27,997.83 | 300 ₹21,051 Lowest | 390 ₹27,366.3 | 400 ₹28,068 |
| 2.00 | Providing and laying cement concrete 1:3:6 (One cement is to three sand is to six graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 5.51 | Cubic Meter | 7,513 ₹41,396.63 | 6,500 ₹35,815 | 7,099 ₹39,115.49 | 4,500 ₹24,795 Lowest | 7,800 ₹42,978 | 7,500 ₹41,325 |
| 3.00 | Boulder filling/stone soling properly hand packed tightly/interstices with Kharanja stone under floor including carriage of material spreading, watering and rolling of hiding material moorum or earth etc. complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 14.18 | Cubic Meter | 1,513 ₹21,454.34 | 1,800 ₹25,524 | 1,999 ₹28,345.82 | 900 ₹12,762 Lowest | 900 ₹12,762 Lowest | 2,500 ₹35,450 |
| 4.00 | Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 4.2 | Cubic Meter | 8,113 ₹34,074.6 | 6,750 ₹28,350 Lowest | 8,999.49 ₹37,797.86 | 7,000 ₹29,400 | 7,500 ₹31,500 | 8,500 ₹35,700 |
| 5.00 | Providing and laying cement concrete 1:11/2:3(One cement is to one and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 18.8 | Cubic Meter | 9,499 ₹1,78,581.2 | 8,500 ₹1,59,800 | 9,099 ₹1,71,061.2 | 7,600 ₹1,42,880 Lowest | 7,850 ₹1,47,580 | 10,000 ₹1,88,000 |
| 6.00 | Providing and fixing Tor Steel reinforcement for RCC work including in including bending , binding and placing in position complete upto floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 28,046.98 | Kg | 87 ₹24,40,087.26 | 86 ₹24,12,040.28 | 89 ₹24,96,181.22 | 84 ₹23,55,946.32 | 80 ₹22,43,758.4 Lowest | 90 ₹25,24,228.2 |
| 7.00Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||||||
| 7.01 | Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 351.95 | Square Meter | 213 ₹74,965.35 | 150 ₹52,792.5 | 199 ₹70,038.05 | 290 ₹1,02,065.5 | 90 ₹31,675.5 Lowest | 230 ₹80,948.5 |
| 7.02 | Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .(RCC Duct in Kuhl). | 6,345 | Square Meter | 89 ₹5,64,705 | 95 ₹6,02,775 | 99.99 ₹6,34,436.55 | 200 ₹12,69,000 | 10 ₹63,450 Lowest | 230 ₹14,59,350 |
| 8.00 | Extraction of silt removal of debris ,boulders and rocky portion requiring blasting upto a distance of 20 metre disposing of unserviceable materials, and neatly dressing the surface complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 333.36 | Cubic Meter | 99 ₹33,002.64 | 92 ₹30,669.12 | 199 ₹66,338.64 | 50 ₹16,668 | 40 ₹13,334.4 Lowest | 150 ₹50,004 |
Tender Value
₹1.7 Cr
EMD Value
₹1.9 L
Closing Date
27 Jun 2024, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Baijnath
Construction of Diversion Weir at Source RD 0 to 7 Launching apron to protect weir Construction of Main RCC Channel at Various RDs Total Length 2350 Mtrs and Retaining Wall
2024_HPIPH_89121_1
1386-1436
Open Tender
Civil Works
Item Rate
365 days
Baijnath
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,500
EE Baijnath
₹1.9 L
8 Aug 2025
15 Jun 2024
28 Jun 2024
15 Jun 2024
27 Jun 2024
15 Jun 2024
Amount
Excavation in foundations and trenches including pipes and pits in all depths etc. in all lifts and in all kinds of soils such as pick work, jumper work, blasting in soft/ hard rock, chiseling/wedging out of rock (where blasting is prohibited) and saturated soils, stacking the excavated earth within all leads and lifts, clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths, sides of foundations and trenches etc.. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by Engineer in-charge within all leads and lifts including uprooting of trees, dressing of beds and sides and preparation of sub-grade, restoration of unmetalled/ metalled/ paved surfaces to its original conditions(excluding cost of mettaling tarring and concreting including shoring, strutting, "mbering and dewatering, where ever required, providing diversion for traffic, fixing night signals, fixing caution boards, crossing over trenches for access to houses complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:3:6 (One cement is to three sand is to six graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Boulder filling/stone soling properly hand packed tightly/interstices with Kharanja stone under floor including carriage of material spreading, watering and rolling of hiding material moorum or earth etc. complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:11/2:3(One cement is to one and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and fixing Tor Steel reinforcement for RCC work including in including bending , binding and placing in position complete upto floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .(RCC Duct in Kuhl).
Extraction of silt removal of debris ,boulders and rocky portion requiring blasting upto a distance of 20 metre disposing of unserviceable materials, and neatly dressing the surface complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Dressing of bed and preparation sug grade in pick work . complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in :-
Foundation , footing, bases of columns and the like & mass concrete.complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Manufacture and Supplying of Nakka Plate (Water turn out gate ) packed with higher rubber sheet complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing ,Laying and fixing of beep hole of PVC pipe of 90 mm dia as per IS Code 4984 having a test pressure 6 kg/cm2 for wipe hole in retaining wall and breast wall as per the direction of the Engineer in Charge.
KARUN KUMAR
VIJAY KAPOOR
AMIT KATOCH
Lalit Pal
VIPAT RAM
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .