Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance GSTIN: 01FDYPS0018A1ZU, 01KFNPS7554R1ZA, 07BLBPK3559B1ZE, 08AHHPP3466D1Z9, 08CJMPS5947K1Z9, 08GBLPB4111B1Z9, 09AJNPM6929J1ZG, 09AKPPJ8856N1Z1, 09ALEPV7598P1ZP, 09ALMPY3384N1ZY, 09AMYPK0800C1Z6, 09ANIPA2410R1ZX, 09AOXPP2051B1ZT, 09AWNPS1705K1Z2, 09FAWPD9587C2ZW, 09FVRPS5363B1Z0, 10CBBPP4649G1ZV, 20AEDPK6903R1ZD, 20BORPM3430C1ZE, 23APQPM3845J1ZI, 23CRAPG7067G1ZZ0 ADITYA ENTERPRISES 0 UNNAO HARDOI ROAD KISHORI KHERA UNNAO UTTAR PRADESH UNDER NAGAR PALIKA UNNAO UTTAR PRADESH 209801 | UNNAO | UTTAR PRADESH | 209801 | ₹11.4 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical GSTIN: 23AACPQ2197C2ZYCENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical As per NIT. |
| 3 | Rejected-Technical GSTIN: 20ALXPM0071F1ZACENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical As per NIT. |
| 4 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | - | Rejected-Technical As per NIT. |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Cost of Copper wire with DPC covering covering size-9 SWG | 1,050 | Kg | 1,187 ₹12.5 L |
| 2.00 | Insulation Cost | 1 | No. | 1,86,952.5 ₹1.9 L |
| 3.00 | Labour Cost | 1 | No. | 1,86,952.5 ₹1.9 L |
| 4.00 | Less scrap @60% of Sl. No. 01 | 1 | No. | 7,47,810 -₹7,47,810 |
| 5.00 | Cost of Gasket/Corksheet 2 X 3 X 6mm | 3 | No. | 2,745 ₹8,235 |
| 6.00 | Overhead Profit | 1 | No. | 88,068 ₹88,068 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 1,74,374.64 ₹1.7 L |
Tender Value
₹10.6 L
EMD Value
₹13,300
Closing Date
7 Apr 2026, 9:00 amClosed
Project Engineer EnM Bhurkunda Colliery
Office Of Project Engineer EnM Bhurkunda Colliery
Repairing and rewinding of 1.5 MVA, 11KV/3.3KV , East India Electrical make, Sl No. 387/2 power transformer under Bhurkunda Colliery.
2026_CCL_357636_1
PE(EnM)/BHK/e Tender/25-26/53
Open Tender
Electrical and Maintenance Works
25 days
Office Of Project Engineer EnM Bhurkunda Colliery
Please refer tender documents
2 documents required · 2 mandatory
₹13,300
26 May 2026
27 Mar 2026
8 Apr 2026
28 Mar 2026
7 Apr 2026
28 Mar 2026
28 Mar 2026 - 2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cost of Copper wire with DPC covering covering size-9 SWG | |||||
| 2Insulation Cost | |||||
| 3Labour Cost | |||||
| 4Less scrap @60% of Sl. No. 01 | |||||
| 5Cost of Gasket/Corksheet 2 X 3 X 6mm | |||||
| 6Overhead Profit | |||||
| 7Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_370498.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid