| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.4 L+₹46,785.25 (11.9%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.4 L+₹52,908.35 (13.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹4.5 L+₹61,825.49 (15.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.6 L+₹65,986.82 (16.8%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.9 L
EMD Value
₹11,880
Closing Date
20 Jul 2026, 4:00 pmClosed
exen r and b watergam
ofc of xen r and b rafiabad
Laying of Slab on already constructed Abutements at Laiser
2026_PWDJK_315379_4
e nit 24 of 2026-27 dated 10/07/2026
Open Tender
Civil Works
Percentage
30 days
rafiabad
NIT
2 documents required · 2 mandatory
₹300
exen r and b rafiabad
₹11,880
23 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 16.05 | Cum | 9,821.85 | ₹1,57,640.69 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,167.38 | Kg | 123.2 | ₹2,67,021.22 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Complete Job | 43.76 | Sqm | 718.2 | ₹31,428.43 |
| 5 | Providing and laying in position boulders / Nallah Muck / quary muck behind abutments / wing / lining walls and in approaches including all carriages, consolidation and watering. Complete job | 52.06 | Cum | 1,200 | ₹62,472 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer and two or more coats of paint all complete. Welded | 437.32 | kg | 138.2 | ₹60,437.62 |
| 7 | 15 mm thick 1:4 cement sand plaster incl cost of material etc complete | 16.73 | sqm | 327 | ₹5,470.71 |
| 8 | Carriage of Material
Sand (Av. Lead 25 km) | 7.22 | Cum | 465.14 | ₹3,358.31 |
| 9 | Aggregates (Av. Lead 25 km) | 14.29 | cum | 465.14 | ₹6,646.85 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_1022732.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .