Loading…
Loading…
Tender Value
₹4.2 L
EMD Value
₹10,588
Closing Date
9 Oct 2026, 6:00 pm5d left
The Assistant Engineer
The Assistant Engineer
BUILDING MAINTENANCE
2026_LSGD_875229_1
20/AE/LIDEW/VPT/P241/26-27
Open Tender
Civil Works - Buildings
Percentage
150 days
Valakom GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹935
Yes
₹10,588
Yes
1 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Kitchen and Dining Hall | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 3.11 | cum | 257.63 | ₹802.26 |
| 1.002 | OD63807/2026-2027:Dry rubble masonry with good quality blasted rubble including conveyance of materials and
labour charges etc. complete as per direction of departmental officers at site . | 2.83 | cum | 3,653.72 | ₹10,325.41 |
| 1.003 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.06 | cum | 8,343.49 | ₹8,844.1 |
| 1.004 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 6.49 | cum | 7,279.03 | ₹47,262.74 |
| 1.005 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 43.29 | sqm | 369.76 | ₹16,006.91 |
| 1.006 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 43.29 | sqm | 209.26 | ₹9,058.87 |
| 1.007 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.53 | cum | 10,488.77 | ₹5,559.05 |
| 1.008 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 2.36 | sqm | 839.6 | ₹1,977.26 |
| 1.009 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.58 | cum | 13,442.14 | ₹7,823.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
FoT.pdf
Tender Documents • 0.40 MB
AFFIDAVIT.pdf
Tender Documents • 0.35 MB
epayment.pdf
Tender Documents • 0.35 MB
PA.pdf
Tender Documents • 0.26 MB
BOQ_1485941.xls
BOQ • 0.35 MB
IP.pdf
Tender Documents • 0.34 MB
SBDNIT241.pdf
Tender Documents • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .