Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹62.0 LAccepted-AOC | 1st | Accepted-AOC Agreement executed | |
| 2 | 2nd₹64.9 L+₹2.9 L (4.67%)Rejected-AOC | 2nd | Rejected-AOC Rejected | |
| 3 | 3rd₹72.6 L+₹10.6 L (17.1%)Rejected-AOC | 3rd | Rejected-AOC Rejected |
Tender Value
₹62.0 L
EMD Value
₹50,000
Closing Date
12 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Roads Division Idukki
RM RC II Phase I Zone VI roads section Kattappana 7road stretches for a length of 25.117KM
2024_PWD_640219_1
64/EE/2023-24
Open Tender
Civil Works - Roads
Item Rate
365 days
Kattappana
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
19 Feb 2024
5 Jan 2024
16 Jan 2024
5 Jan 2024
12 Jan 2024
5 Jan 2024
Amount
Appendix A -Initial Rectification Work
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD67818/2023-2024:Mix seal surfacing providing, laying and rolling of close - graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.9mm Type - A aggregate using penetration grade bitumen to required line, grade and level and level to serve as wearing course on previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification clause 509 of MORD (Usage of bitumen is 22.00 kg /(10m2) By Manual Means
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
OD192412/2023-2024:Vinyl sticker including lettering and printing
OD200451/2023-2024:Providing and Fixing of DLP board non reflectorised sign made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting , 2mm thick /aluminium composit material sheeting 4mm thick with area not exceeding 0.9 sqm, with suitable back supporting with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NBconfirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cmbelow ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including
Appendix -B Pre-monsoon works
OD67812/2023-2024:Engaging hydraulic excavator for clearing blocked up ventway of culvert , drains and cutting and pushing the earth to embankment upto a distance of 100 metres (average lead 50 mtres)
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD67813/2023-2024:Engaging tipper for removing slipped earth and other unserviceable materials.
OD67814/2023-2024:Engaging Man Mazdoor for removing /cleaning the rubbish and other aligned activities etc.
OD68252/2023-2024:Supplying instant road repair mix for filling up potholes in packets which contains 25kg of compounds
Appendix-C Preventive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
OD68219/2023-2024:Supplying instant road repair mix for filling up potholes in packets which contains 25kg of compounds
OD67820/2023-2024:Engaging Man Mazdoor for laying and compacting ready mixed cold bituminous compound.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
OD67821/2023-2024:Mix seal surfacing providing, laying and rolling of close - graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.9mm Type - A aggregate using penetration grade bitumen to required line, grade and level and level to serve as wearing course on previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification clause 509 of MORD (Usage of bitumen is 22.00 kg /(10m2) By Manual Means
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
OD67822/2023-2024:Conducting and Reporting Routine Inspection for the entire length of the Project Road frequency of 7 days throughout the agreement period of the Running Contract as directed by as per departmental officers at site.
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
Appendix -D Emergency Works
OD67815/2023-2024:Engaging Wood Cutter for cutting down the dangerously standing trees and its branches
OD67816/2023-2024:Engaging hydraulic excavator for clearing blocked up ventway of culvert , drains and cutting and pushing the earth to embankment upto a distance of 100 metres (average lead 50 mtres)
OD67817/2023-2024:Engaging tipper for removing slipped earth and other unserviceable materials.
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
P I VARGHESE
P J Mathachan
Bidder Name
P J Mathachan
P I VARGHESE
Binoy scaria
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_975772.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .