| 1 | L1₹53.9 LAccepted-AOC | L1 | Accepted-AOC L1 bidder with reasonable rates | |
| 2 | L2₹60.7 L+₹6.6 L (12.2%)Rejected-Finance ERNAKULAM KERALA 683573 UDYAM KL 02 0001988 32AAIFD1158Q1Z8 R M | ERNAKULAM | KERALA | 683573 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹64.4 L+₹10.3 L (19.0%)Rejected-Finance 20 2169 PALLURTH PO ERNAKULUM KERALA 682006 | ERNAKULAM | KERALA | 682006 | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹65.9 L+₹11.8 L (21.9%)Rejected-Finance 18 837 KILIYARAA HOUSE PERUMPADAPPU PALLURUTHY PO KOCHI 682 006 | KOCHI | ERNAKULAM | KERALA | 682006 | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹68.4 L+₹14.3 L (26.4%)Rejected-Finance | L5 | Rejected-Finance Other than lowest bidder |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
31 Jul 2021, 6:00 pmClosed
CWE NW KOCHI
KATARIBAGH NAVAL BASE P O KOCHI 682004
SPECIAL REPAIRS AND RENEWAL OF ANTIFUNGAL PAINT TO EXTERNAL SURFACES OF PAWAR AND PANIGRAHI APARTMENTS AT PANAMPILLY NAGAR
2021_MES_449686_2
CWE(NW)KOCHI/81195
Open Tender
Civil Works
Item Rate
180 days
KOCHI
AS PER NIT
6 documents required · 6 mandatory
₹1,000
GE NW KOCHI
₹1.4 L
Yes
6 Sept 2021
16 Jul 2021
2 Aug 2021
16 Jul 2021
31 Jul 2021
17 Jul 2021
16 Jul 2021 - 17 Jul 2021
Amount
M&L for Complete removal of existing external wall treatment scrapping down and washing with water and filling the cracks properly and making good the damaged plastered surfaces/ RCC chajjas /roof projection with cement mortar / PCC ,scrubbing by using nylon/jute/wire brushes/scrapper blades or by using sanding machines to remove algae, moss, fungus and loosely adhered particles like dust, efflorescence etc and washing the surface with pressure jet washers and surface allowed to dry etc complete upto 4th storey complete all as specified and directed. Notw:- (i) The rate quoted shall include the cost of scaffoldings and cradles including hoisting and lowering as required with bracing, support etc complete. (ii) Approval of PMG shall be obtained before proceeding to next coat,such as complete removal,primer,antifungal paint Ist coat, 2nd coat etc.
All as per item No.1above, but from 5th to 8th storey
All as per item No.1above, but from 9th storey to 12th storey
All as per item No.1above, but from 13 th storey to 16 th storey.
M&L for application of one coat of primer and allowed to dry overnight and applying 3mm thick wall care putty before applying first coat of acrylic exterior emulsion complete upto 4th storey all as specified and as directed. Note :- Before application of primer coat, the moisture of the wall surface shall be checked with a moisture meter .
All as per item No.5 above, but from 5th to 8th storey
All as per item No. 5 above, but from 9th storey to 12th storey
All as per item No.5 above, but from 13 th storey to 16 th storey.
M&L for application of first coat of acrylic exterior emulsion paint on primed wall surface using rollers made from foam or synthetic fibres,to get a smooth and tint free surface and allowed to dry for at least 8 hrs/ overnight to receive second coat of acrylic exterior emulsion paint complete up to 4th storey all as specified and as directed.
All as per item No.9 above, but from 5th to 8th storey
All as per item No.9 above, but from 9th storey to 12th storey
All as per item No.9 above, but from 13 th storey to 16 th storey.
M&L for application of second coat of acrylic exterior emulsion paint on primed wall surface using rollers made from foam or synthetic fibres,to get a smooth and tint free surface complete up to 4th storey all as specified and as directed.
All as per item No.13 above, but from 5th to 8th storey
All as per item No.13 above, but from 9th storey to 12th storey
All as per item No.13 above, but from 13 th storey to 16 th storey.
M&L for Complete removal of existing external treatment from surfaces of external ceiling ,scrapping down and washing with water and filling the cracks properly and making good the damaged plastered surfaces/ RCC chajjas /roof projection with cement mortar / PCC ,scrubbing by using nylon/jute/wire brushes/scrapper blades or by using sanding machines to remove algae, moss, fungus and loosely adhered particles like dust, efflorescence etc and washing the surface with pressure jet washers and surface allowed to dry etc , and applying two coats of weather proof (antifungal) paint over and including a coat of antifungal primer and allowed to dry over night and applying 3 mm thick wall care putty before applying first coat of acrylic exterior emulsion and one coat of sealent base etc complete upto and including 4th storey complete all as specified and directed. Note:- (i) The rate quoted shall include the cost of scaffoldings and cradles including hoisting and lowering as required with bracing, support etc complete. (ii) Approval of PMG shall be obtained before proceeding to next coat,such as complete removal,primer,antifungal paint Ist coat, 2nd coat etc.
All as per item No.17above, but from 5th to 8th storey
All as per item No.17 above, but from 9th storey to 12th storey
All as per item No.17 above, but from 13 th storey to 16 th storey.
M&L for preparation of old distempered surfaces of wall by rubbing down,washing and stopping of distempered surfaces and applying one coat of oil bound distemper 13 th storey to 16 th storey complete all as specified and as directed.
M&L for preparation of old painted steel surfaces of any description over 10 cm width or girth ,not otherwise described and applying one coat of synthetic enamel paint upto and including IV th storey complete all as specified and as directed.
All as per item No. 22 above, but from 5 th to 8th storey
All as per item No. 22 above, but from 9 th to 12 th storey
All as per item No. 22 above, but from 13 th to 16 th storey
M&L for preparation of old painted wooden surfaces of any description over 10 cm width or girth ,not otherwise described and applying one coat of synthetic enamel paint from 13 th to 16 th storey complete all as specified and as directed.
M&L for preparation of old painted steel surfaces of any description over 10 cm width or girth ,not otherwise described and applying one coat of aluminium paint upto and including IV th storey complete all as specified and as directed.
All as per item No.27 above, but from 5th to 8th storey
All as per item No.27 above, but from 9th storey to 12th storey
All as per item No.27 above, but from 13 th storey to 16 th storey.
Demolition of Reinforced Cement Concrete as in Roofs, Floors (Other than ground Floors) Beams, Stair Case , landings, Chajjas and Similar Suspended Works and in any other position and rubbish off the premises (Reinforcement cut as required to facilitate demolition) upto 4th Storey complete all as specified and as directed.
All as per item No.31 above, but from 5th to 8th storey
All as per item No.31 above, but from 9th storey to 12th storey
All as per item No.31 above, but from 13 th storey to 16 th storey.
M&L for RCC (Nominal Mix 1:2:4) type B0 using 12.5 mm graded stone aggregate using micro concrete as in Fins, Facias , Louvers , parapets and railings exc.60 cm in height, newels , newels, balustrade etc., and the similar work upto 4th Storey complete all as specified and as directed.
All as per item No.35 above, but from 5th to 8th storey
All as per item No.35 above, but from 9th storey to 12th storey
All as per item No.35 above, but from 13 th storey to 16 th storey.
M&L for RCC (Nominal Mix 1:2:4) type B0 using12.5 mm graded stone aggregate using micro concrete as in columns,pillers,piers,posts and struts etc., and the similar work upto 4th Storey complete all as specified and as directed.
All as per item No.39 above, but from 5th to 8th storey
All as per item No.39 above, but from 9th storey to 12th storey
All as per item No.39 above, but from 13 th storey to 16 th storey.
M&L for RCC (Nominal Mix 1:2:4) type B0 using12.5 mm graded stone aggregate using micro concrete as in chajjas and the similar work upto 4th Storey complete all as specified and as directed.
All as per item No.43 above, but from 5th to 8th storey
All as per item No.43 above, but from 9th storey to 12th storey
All as per item No.43 above, but from 13 th storey to 16 th storey.
M&L for TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips upto 4th Storey complete all as specified and as directed.
All as per item No.47 above, but from 5th to 8th storey
All as per item No.47 above, but from 9th storey to 12th storey
All as per item No.47 above, but from 13 th storey to 16 th storey.
Use and waste of form work flat for fins,louvers,fascia rough finished surfaces etc complete upto and including IV th storey complete all as specified and as directed.
All as per item No.51 above, but from 5th to 8th storey
All as per item No.51 above, but from 9th storey to 12th storey
All as per item No.51 above, but from 13 th storey to 16 th storey.
Use and waste of form work flat to sides of columns,pillers,posts and stanchions (square retangular or polygonal) rough finished surfaces etc complete upto and including IV th storey complete all as specified and as directed.
All as per item No.55 above, but from 5th to 8th storey
All as per item No.55 above, but from 9th storey to 12th storey
All as per item No.55 above, but from 13 th storey to 16 th storey.
Use and waste of form work flat to chajjas ,troughs and similar works including edges etc,rough finished surfaces etc complete upto and including IV th storey complete all as specified and as directed.
All as per item No.59 above, but from 5th to 8th storey
All as per item No.59 above, but from 9th storey to 12th storey
All as per item No.59 above, but from 13 th storey to 16 th storey.
S&F in repairs cast iron sand cast soil waste and vent pipes 100mm bore in any length with or with out ears,with cement joints fixed to wall complete upto and including IV th storey complete all as specified and as directed.
All as per item No.63 above, but from 5th to 8th storey
All as per item No.63 above, but from 9th storey to 12th storey
All as per item No.63 above, but from 13 th storey to 16 th storey.
S&F in repairs cast iron sand cast soil waste and vent pipes 75 mm bore in any length with or with out ears,with cement joints fixed to wall complete upto and including IV th storey complete all as specified and as directed.
All as per item No.67 above, but from 5th to 8th storey
All as per item No.67 above, but from 9th storey to 12th storey
All as per item No.67 above, but from 13 th storey to 16 th storey.
S&F 100 mm bore cast iron branch pieces,single (equal or unequal) ordinary or inverted (spigot and socket type ) or with parallel branches etc complete upto and including IV th storey complete all as specified and as directed.
All as per item No.71 above, but from 5th to 8th storey
All as per item No.71 above, but from 9th storey to 12th storey
All as per item No.71 above, but from 13 th storey to 16 th storey.
S&F 75 mm bore cast iron branch pieces,single (equal or unequal) ordinary or inverted (spigot and socket type ) or with parallel branches etc complete upto and including IV th storey complete all as specified and as directed.
All as per item No.75 above, but from 5th to 8th storey
All as per item No.75 above, but from 9th storey to 12th storey
All as per item No.75 above, but from 13 th storey to 16 th storey.
S&F 100 mm bore cast iron bends with access door etc complete upto and including IV th storey complete all as specified and as directed.
All as per item No.79 above, but from 5th to 8th storey
All as per item No.79 above, but from 9th storey to 12th storey
All as per item No.79 above, but from 13 th storey to 16 th storey.
S&F 75 mm bore cast iron bends with access door etc complete upto and including IV th storey complete all as specified and as directed.
All as per item No.83 above, but from 5th to 8th storey
All as per item No.83 above, but from 9th storey to 12th storey
All as per item No.83 above, but from 13 th storey to 16 th storey.
S&F 100 mm bore cast iron vent cowl etc complete from 13 th storey to 16 th storey complete all as specified and as directed.
S&F 75 mm bore cast iron vent cowl etc complete from 13 th storey to 16 th storey complete all as specified and as directed.
Taking down cement plaster of any description on walls including raking out joints, hacking for key scrubbing down with water etc and rendering 15mm thick on brick or concrete surfaces in cement mortar 1:4 finished even and smooth (without using extra cement) upto 4th storey all as specified and as directed .
All as per item No.89 above, but from 5th to 8th storey
All as per item No.89 above, but from 9th storey to 12th storey
All as per item No.89 above, but from 13 th storey to 16 th storey.
M&L for application of one coat of primer and allowed to dry overnight and apply 3 mm thick wall care putty to receive first coat of acrylic exterior emulsion paint complete up to and including 4th storey all as specified and as directed. Note :- Before application of primer coat, the of the wall surface shall be checked with moisture meter
All as per item No.93 above, but from 5th to 8th storey
All as per item No.93 above, but from 9th storey to 12th storey
All as per item No.93 above, but from 13 th storey to 16 th storey.
M&L for destruction of growth of weed plants with roots on the roof of bldgs. and on the wall of bldgs. at any height with 24 'D' oil mixed weedicides or mixed with veedol chemical solution and sprayed in and around roots and at places of possible growth of weeds all as directed by the Engineer-in-charge. Note for Item No. 97:- (i) In case of plants that has trees like growth, the plant should be cut to avoid damages to roof/wall and rest to be treated with chemical solution (ii) The area after treatment shall be cleaned off all debris branches dead plant etc. Note for Item No. 1 to 30 & 89 to 96:- (i) The distempering /Antifungal painting /emulision painting on walls,chajjas,external ceiling,roof projection,steel surfaces,wooden surfaces,stair case and all other parts of building as mentioned in BoQ shall be carried out by OEM /authorised applicator of OEM using modern tools and techniques. (ii) Approval of GE for OEM /auhorised applicator of OEM shall be taken by the contractor within 15 days of acceptance of the contract (iii) MoU between the contractor and OEM /authorised applicator of OEM shall be submitted within 15 days after getting the approval as per note (ii) above
DUROLAC
Jack Electrolinks Private Limited
Anaswara Constructions
M/s ANTONY THOMAS AND CO
M.J. Leons and sons
M.J.JOY AND COMPANY
Classic Builders
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .