Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.0 L+₹7,296.27 (2.46%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RAMESH KUMAR T G L2 | P. R. MANIKANDAN L1 |
|---|---|---|---|---|---|
| 1.00Road Renovation | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 162.3 | sqm | 22 ₹3,570.6 | 16.01 ₹2,598.42 Lowest |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 16.23 | cum | 3,350 ₹54,370.5 | 3,337.88 ₹54,173.79 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 24.34 | cum | 9,800 ₹2,38,581 | 9,563.75 ₹2,32,829.49 Lowest |
| 1.00 | OD171243/2026-2027:Filling with quarry muck-Filling up low lying and water logged areas with local materials/ quarry muck spreading in layers, levelling the top at site and consolidation by ramming etc complete for improving the CBR value of sub grade | 7.3 | cum | 999 ₹7,296.7 | 947.54 ₹6,920.83 Lowest |
Tender Value
₹3.0 L
EMD Value
₹7,413
Closing Date
13 Oct 2026, 5:00 pmClosed
Muhsin Munavar P K
Assistant Engineer Office-LID and EW Section-Kongad Grama Panchayath
Koottapura Malampadam Road Renovation in Ward No-8-Pro No-110-27
2026_LSGD_874662_7
ET-03-AE-LIDEW-KGP-2026-27
Open Tender
Civil Works - Roads
Item Rate
240 days
Kongad Grama Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹7,413
Yes
17 Oct 2026
3 Oct 2026
16 Oct 2026
3 Oct 2026
13 Oct 2026
3 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Renovation | |||||
| 1.001 | 3.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 162.3 | sqm | - | - |
| 1.002 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 16.23 | cum | - | - |
| 1.003 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 24.35 | cum | - | - |
| 1.004 | OD171243/2026-2027:Filling with quarry muck-Filling up low lying and water logged areas with local materials/ quarry muck spreading in layers, levelling the top at site and consolidation by ramming etc complete for improving the CBR value of sub grade | 7.3 | cum | - | - |
stage.html
html • 0.02 MB
finance_1484686.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tendernotice_2.pdf
PDF • 0.03 MB
Tendernotice_3.pdf
PDF • 0.02 MB
BOQ_1484686.xls
BOQ • 0.30 MB
NIT.pdf
Tender Documents • 0.03 MB
SBD.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .