Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC GRAM MIRZAPUR SAID MANDAWALI TEHSIL NAJIBABAD DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | ₹10.0 Cr Quoted ₹10.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.9 Cr+₹55.8 L (5.42%)Rejected-AOC | ₹10.9 Cr+₹55.8 L (5.42%) | L2 | Rejected-AOC L2 |
| 3 | L3₹11.0 Cr+₹66.1 L (6.42%)Rejected-Finance UTTAR PRADESH | UNNAO | UTTAR PRADESH | 209869 | ₹11.0 Cr+₹66.1 L (6.42%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.7 Cr+₹1.4 Cr (13.5%)Rejected-Finance KOTHI NO 6 CIVIL LINES OPP TB TOWER DISTRICT MORADABAD UTTAR PRADESH | MORADABAD | UTTAR PRADESH | 244001 | ₹11.7 Cr+₹1.4 Cr (13.5%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical ROOMPUR | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | M/S M A DEVELOPERS AND ENGINEERS L4 | M/S SARIK INFRATECH L1 | M/S NANHEY RAM PANDEY L3 | Niravana Infratech L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Part-A
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m -301(3.11) | 10,705 | Cum | 30 ₹3,21,150 Lowest | 38 ₹4,06,790 | 40 ₹4,28,200 | 50 ₹5,35,250 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 10,705 | Cum | 30 ₹3,21,150 Lowest | 44 ₹4,71,020 | 30 ₹3,21,150 Lowest | 55 ₹5,88,775 |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and 2 Km. leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 48,778 | Cum | 60 ₹29,26,680 Lowest | 101 ₹49,26,578 | 95 ₹46,33,910 | 110 ₹53,65,580 |
| 4.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 2,590 | Cum | 80 ₹2,07,200 Lowest | 120 ₹3,10,800 | 95 ₹2,46,050 | 110 ₹2,84,900 |
| 5.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 6,281 | Cum | 2,700 ₹1,69,58,700 | 2,200 ₹1,38,18,200 Lowest | 2,800 ₹1,75,86,800 | 2,500 ₹1,57,02,500 |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water at OMC in mechanical mix (Plant), carriage of mixed material by tipper to site laying in uniform layers With grader in sub-base/base course on well prepared under base and compacting with vibratory-roller to achieve the desired density. Laying using grader | 4,370 | Cum | 2,500 ₹1,09,25,000 | 2,250 ₹98,32,500 Lowest | 3,000 ₹1,31,10,000 | 2,700 ₹1,17,99,000 |
| 7.00 | Providing and applying primer Coat with SS-1 grade bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying of primer @ 0.60 kg/sqm using mechanical means. | 23,875 | Sqm | 35 ₹8,35,625 | 21 ₹5,01,375 Lowest | 26 ₹6,20,750 | 31 ₹7,40,125 |
| 8.00 | Providing and applying Tack Coat with Bitumen VG-10 using pressure distributor @ 0.25 kg per sqm on the prepared Granular surface cleaned with mechanical broom. | 48,101 | Sqm | 15 ₹7,21,515 | 9 ₹4,32,909 Lowest | 12 ₹5,77,212 | 11 ₹5,29,111 |
| 9.00 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH producing an average output of 75 Tonnes per hour using crust aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade , level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 4,652 | Cum | 9,162 ₹4,26,21,624 | 8,350 ₹3,88,44,200 | 8,000 ₹3,72,16,000 | 7,600 ₹3,53,55,200 Lowest |
| 10.00 | Providing and applying Tack Coat with Bitumen VG-10 using pressure distributor @ 0.20 kg per sqm on the prepared Granular surface cleaned with mechanical broom. | 72,215 | Sqm | 12 ₹8,66,580 | 8 ₹5,77,720 Lowest | 9 ₹6,49,935 | 10 ₹7,22,150 |
Tender Value
₹14.0 Cr
EMD Value
₹27.4 L
Closing Date
24 Mar 2026, 12:30 pmClosed
SE Rampur Circle PWD Rampur
Office of SE Rampur Circle PWD Rampur
Widening and Strengthening of Bilaspur Milak Road Km-5 to Dhavni Chainpur Road (ODR) from Ch. 0.000 to 13.000 in District Rampur (including 05 years maintenance).
2026_CEMBD_1125865_2
1066/E-Tender-RC/25-26 Date 10.02.2026
Open Tender
Civil Works - Roads
Percentage
365 days
RAMPUR
As per NIT, SBD, Prahari
2 documents required · 2 mandatory
₹2,354
₹27.4 L
Yes
Office of SE Rampur Circle PWD Rampur
23 Apr 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m -301(3.11) | 10,705 | Cum | - | - |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 10,705 | Cum | - | - |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and 2 Km. leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 48,778 | Cum | - | - |
| 4 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 2,590 | Cum | - | - |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 6,281 | Cum | - | - |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water at OMC in mechanical mix (Plant), carriage of mixed material by tipper to site laying in uniform layers With grader in sub-base/base course on well prepared under base and compacting with vibratory-roller to achieve the desired density. Laying using grader | 4,370 | Cum | - | - |
| 7 | Providing and applying primer Coat with SS-1 grade bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying of primer @ 0.60 kg/sqm using mechanical means. | 23,875 | Sqm | - | - |
| 8 | Providing and applying Tack Coat with Bitumen VG-10 using pressure distributor @ 0.25 kg per sqm on the prepared Granular surface cleaned with mechanical broom. | 48,101 | Sqm | - | - |
| 9 | Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH producing an average output of 75 Tonnes per hour using crust aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade , level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 4,652 | Cum | - | - |
| 10 | Providing and applying Tack Coat with Bitumen VG-10 using pressure distributor @ 0.20 kg per sqm on the prepared Granular surface cleaned with mechanical broom. | 72,215 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
SBD_CHAINPUR.pdf
Tender Documents • 1.33 MB
BOQ_2099868.xls
BOQ • 0.27 MB
Corrigendum1446.pdf
Additional Documents • 0.74 MB
corrigendum1599.pdf
Additional Documents • 0.74 MB
5CrGO.pdf
PDF • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .