| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC VADAVANUR GP 30 LAKHS LAC ADS NENMMARA 2024 25 MAZHOORKKAVU PERUNCHIRA ROAD IN VADAVANUR GP 30 LAKHS GENERAL CIVIL WORK | VELLORE | TAMIL NADU | 632001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.6 L+₹4.4 L (20.6%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹25.8 L+₹4.6 L (21.9%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹23.2 L
EMD Value
₹34,900
Closing Date
22 Jul 2021, 4:00 pmClosed
Executive Engineer MI Division, Palakkad
Executive Engineer MI Division, Palakkad
Inter linking of ponds Sustainable Water Conservation Project for Chittur Region by Interlinking of Ponds and Traditional Storage Structures Phase 1 Renovation of Public Ponds Improvements to ErattuChalla Ward 15Ayyappankavu Perumatti Grama Panchaya
2021_Irrig_430019_1
03/ET/EE/MI/PKD/2021-2022
Open Tender
Civil Works - Others
Item Rate
210 days
perumatty
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,095
₹34,900
Yes
7 Dec 2021
14 Jul 2021
27 Jul 2021
14 Jul 2021
22 Jul 2021
14 Jul 2021
14 Jul 2021 - 16 Jul 2021
Amount
General Works
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
60.2.3 : Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od43906/2020_2021/IA : Earth work excavation in all class of soil as per item No 2.6.1, the earth conveyed from site and cost recovered With necessary permissions obtained from other departments by the contractor
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
overflow pipe and Sluice pipe Suppourting Structure
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
10.2 : Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
10.5.1 : Providing and fixing 1 mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using M.S. angels 40x40x6 mm for diagonal braces
od43980/2020_2021/IA : Supplying and ixing CI Valve of dia 150mm including cost, conveyance and labourcharges etc.as per the direction of departmental officers at the site.
Sluices
od18601/2019_2020/IA : Providing and laying 165mm PVC Pipe 6kg/cm2 including excavating trenches 1.10m depth refilling and compacting after laying , all labour, materials and hirecharges of tools and plants conveyance etc complete.
od43975/2020_2021/IA : Providing and laying 300mm dia RCC pipe to lines and levels in canal, outlet and inletof ponds for smooth conveyance of irrigation water
TRIMANA CONSTRUCTION LLP
VINAYAN
Bidder Name
SOORAJ K / AQUA FARMS
TRIMANA CONSTRUCTION LLP
VINAYAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_610306.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .