Tender Value
₹14.6 Cr
EMD Value
₹50,000
Closing Date
7 Mar 2023, 1:00 pmClosed
CE
Jammu
Construction of 11 No 5000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 1 No 10000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 12 No Intake well, 12 No Pump Room, 10 No 10000 Glns Sump Tank, 2 No 20000 Glns Sump Tank, 2030mtr Boundary
2023_PHE_203633_1
e-NIT No.306 of 2022-23
Open Tender
Civil Works
Percentage
180 days
Nowshera
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
CAO
₹50,000
Yes
CE
25 Mar 2023
28 Jan 2023
7 Mar 2023
28 Jan 2023
7 Mar 2023
30 Jan 2023
30 Jan 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavatedearth as directed:
All kinds of soil. | 1,583.34 | cum | 436 | ₹6,90,336.24 |
| 2 | Earth work in excavation by manual means in trenches for foundation , drains , pipes cables etc (not exceeding 1.5 mtr in width) and for shafts wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in ordinary rock. | 84.48 | cum | 841.6 | ₹71,098.37 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil. | 2,781.69 | cum | 539.35 | ₹15,00,304.5 |
| 4 | Earth work in bulk excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. On plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soil in ordinary rock | 203.7 | cum | 855.65 | ₹1,74,295.91 |
| 5 | Earth work in bulk excavation by Mechanical means (Hydraulic excavator) over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. On plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soils. | 8,710.1 | CUM | 188.75 | ₹16,44,031.38 |
| 6 | Extra for every additional lift of 1.5mtr or part therof in excavation/banking excavated or stacked material in all kind of soil.
1st lift | 1,693.2 | cum | 81.65 | ₹1,38,249.78 |
| 7 | 2nd lift | 1,207.2 | cum | 163.3 | ₹1,97,135.76 |
| 8 | 3rd lift | 802.2 | cum | 244.95 | ₹1,96,498.89 |
| 9 | Extra rates for quantaties of earth works executed in or under water and/or liquid mud, including pumping out water as required, shall be @ 20% of the rate of the item per mtr depth. The unit namely ,meter depth to be considered for payment shall be the depth measured from the sub soil water level uptothe center of gravity of the quantity executed in these difficult conditions. The depth shall be reckoned correct to 0.1 meter, 0.05 meteror more shallbe taken as 0.1meter and less than 0.05 meter ignored.The extra percentage rate is applicable in respect of each item but limited to quantaties of work executed in these difficult conditions
1st lift of 1 mtr below sub soil water level upto the centre of gravity of the Qty executed under sub soil water conditions.per mtr depth. | 1,071 | cum | 37.75 | ₹40,430.25 |
| 10 | 2nd lift of 1 mtr below sub soil water level upto the centre of gravity of the Qty executed under sub soil water conditions.per mtr depth. | 855 | cum | 75.5 | ₹64,552.5 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_544377.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .