Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹95,814.00Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹96,006.01+₹192.01 (0.20%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹96,000
EMD Value
₹1,920
Closing Date
29 Sept 2026, 6:00 pmClosed
Executive Engineer REW Baramulla
REW BARAMULLA
CONSTRUCTION OF MAIN GATE AND ALLIED WORKS AND ALLIED WORKS OF GOVT. MIDDLE SCHOOL CHANDERHAMA PYT HAMRAY YEAR 2026-27 UNDER CDF HBLE MLA
2026_RDPR_325689_13
236/Xen/Rew/Bla/2026-27 Dated 22/09/2026 (RETENDER)
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹1,920
30 Sept 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
29 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed in all kinds of soil. | 5.28 | cum | 479.3 | ₹2,530.7 |
| 2 | P/L dry stone solling hand packed including all carriages/ HL and including 20% plums. | 1.12 | cum | 1,000 | ₹1,120 |
| 3 | Providing and laying in position of cement concrete of specified grade In 1:3:6 ( 1 : cement : 3 coarse sand : 6 graded stone agg. ) including curing but excluding the cost of centering and shuttering | 4.32 | cum | 5,733.6 | ₹24,769.15 |
| 4 | Plumb 20% | 1.13 | cum | 1,000 | ₹1,130 |
| 5 | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 15.89 | sqm | 283.8 | ₹4,509.58 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc | 60.97 | sqm | 286.35 | ₹17,458.76 |
| 7 | structural steel work in built up section incl cutting hoisting comp. incl priming coat including Painting Compelete | 320 | kg | 120.8 | ₹38,656 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats | 11.89 | sqm | 131 | ₹1,557.59 |
| 9 | carriage by MT of 30 kmtr sand Aggregates by mannual means for avg. | 4.37 | cum | 406 | ₹1,774.22 |
| 10 | photograph /signboard charges(2.5X2.5)size | 1 | job | 2,500 | ₹2,500 |
stage.html
html • 0.02 MB
finance_1101102.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_1101102.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .