Loading…
Loading…
Tender Value
₹10.2 L
EMD Value
₹25,500
Closing Date
5 Aug 2026, 3:00 pm
Chief Engineer, TTD, Tirupati
Room No.128, TTD Admn. Bldg., Tirupati
Providing Temporary Illuminations for Vinayaka Chavithi Nimajjanam, Mahasivarathri illuminations for local temples and other miscelleneous functions etc. in ESD-III, Tirupati for the year 2026-27
965867
251/DE(Elec)-II/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
CHITTOOR
6 documents required · 6 mandatory
₹360
₹25,500
21 Jul 2026
21 Jul 2026
21 Jul 2026
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Five days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Five days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Five days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/200 Amps TPST / TPIC switch with pilot lamp and neutral. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/200 Amps TPST / TPIC switch with pilot lamp and neutral. For Five days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 125 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Supply of Diesel Oil
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Two days. Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Five days. Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Two days. Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required. 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Five days. Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required. 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Single pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days. Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Four pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days. Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of 12’ to 25’ insulated iron / insulated GI pipe / wooden post for fixing of LED thoranams / MH fittings / LED fittings / Halozen fittings etc, as directed during execution. Per programe maximum upto ten days. Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection wih control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection wih control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Five days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets) - For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets) - For Five days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
(Rupees Ten Lakh Sixteen Thousand Eight Hundred Twenty Six and Paise Fifty Two only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 251.docx
TENDER_DOCUMENT • 0.16 MB
Schedule 251.xls
TENDER_DOCUMENT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].