Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC | ₹20.5 L | L1 | Accepted-AOC L1 Accepted for further proceedings |
| 2 | L2₹21.5 LRejected-Finance THOTTASSERI HOUSE ALIPPARAMBA POST MALAPPURAM 679357 | MALAPPURAM | MALAPPURAM | KERALA | 679357 | ₹21.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹21.7 LRejected-Finance | ₹21.7 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Mohammed Rafeeq T. L2 | Shameem L3 | M HUSSAIN L1 |
|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||
| 1.01 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 180 | sqm | 20 ₹3,600 | 20.24 ₹3,643.2 | 16.7 ₹3,006 |
| 1.02 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 240 | cum | 240 ₹57,600 | 242.88 ₹58,291.2 | 236.63 ₹56,791.2 |
| 1.03 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift up to 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil | 16.1 | cum | 350 ₹5,634.65 | 354.2 ₹5,702.27 | 330.41 ₹5,319.27 |
| 1.04 | 4.1.5
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3
coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mmnominal size derived from natural sources) | 7.22 | cum | 7,900 ₹57,061.7 | 7,994.8 ₹57,746.44 | 7,870.91 ₹56,851.58 |
| 1.05 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.64 | cum | 9,700 ₹1,03,256.5 | 9,816.4 ₹1,04,495.58 | 9,634.13 ₹1,02,555.31 |
| 1.06 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels,
beams, plinth beams, girders bressumers and cantilevers | 85.16 | sqm | 750 ₹63,870 | 759 ₹64,636.44 | 700.72 ₹59,673.32 |
| 1.07 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 392.8 | kg | 120 ₹47,136 | 121.44 ₹47,701.63 | 103.26 ₹40,560.53 |
| 1.08 | 50.10.1 Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 3,544.14 | kg | 220 ₹7,79,710.36 | 222.64 ₹7,89,066.88 | 212.12 ₹7,51,782.55 |
| 1.09 | 50.10.2
Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including weldingand bolted with special shaped washers etc. complete | 438.37 | kg | 180 ₹78,906.96 | 182.16 ₹79,853.84 | 171.81 ₹75,316.69 |
Tender Value
₹20.5 L
EMD Value
₹50,000
Closing Date
6 Oct 2025, 1:00 pmClosed
Sr. Manager
SILK FOUNDRY UNIT PALAPPURAM P.O, OTTAPALAM PALAKKAD- 679 103
GENERAL Perinthalmanna Municipality Annual Project No 501/26, Construction of MRF,SBM 2 at Kalathinakkara Perinthalmanna Municipality General Civil Work
2025_SILK_803771_1
SILK/FUO/TD/2025-26/28
Open Tender
Miscellaneous Works
360 days
Perinthalmanna
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
8 Jul 2026
29 Sept 2025
7 Oct 2025
29 Sept 2025
6 Oct 2025
29 Sept 2025
29 Sept 2025 - 6 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid