Tender Value
₹17.3 L
EMD Value
₹18,000
Closing Date
9 Feb 2022, 12:00 pmClosed
SE ETC II MORADABAD
220 KV S/S CAMPUS MAJHOLA MORADABAD
WORK FOR REPLACEMENT OF 220 KV MAIN BUS-I AND II FROM ACSR SINGLE TARANTULA CONDUCTOR TO ACSR TWIN MOOSE CONDUCTOR AGAINST AUGMENTATION OF 220 KV S S AMROHA UNDER ETD, AMROHA
2021_UPTCL_661999_2
E-T-105/ETC-II/M/2021
Open Tender
Electrical Works
90 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD AMROHA ,SBI CURRENT ACCOUNT NO. 30723557626
₹18,000
18 Feb 2022
25 Jan 2022
9 Feb 2022
25 Jan 2022
9 Feb 2022
25 Jan 2022
Amount
WORK FOR REPLACEMENT OF 220 KV MAIN BUS-I & II FROM ACSR SINGLE TARANTULA CONDUCTOR TO ACSR TWIN MOOSE CONDUCTOR AGAINST AUGMENTATION OF 220 KV S/S AMROHA UNDER ETD, AMROHA.
PART-A (WORK) Cutting/Opening of single Tarantula conductor cross jumper among the three sections of each phase of existing 220 KV main bus I & II and shifting of the recovered material from site to store.
Cutting/Opening of single Zebra Conductor jumper/ dropper of each phase of existing 220 KV main bus-I&II to bus isolator, shifting of material from site to store. There are 07 nos. 220 KV bays. Thus total Nos. of jumper/droppers 14x3=42.
Dismantling of existing single Tarantula conductor of each phase of 220 KV main bus-I&II & shifting of the recovered material from site to store. There are 08 Nos. sections having 03 Nos. conductores in each sections.
Stringing of Twin moose conductor of each phase of 220 KV main bus-I & II with the help of single tension twin moose fitting alongwith spacers, hoisting of Disc insulators and other hardware at both ends of span & proper sagging including cutting, bending of conductor to & for shifting of the material from store to site. Each bus has 03 spans having 08 Nos. of twin moose conductors.Total nos. of section conductors. 8x3=24
Reconnection of Single Moose jumper/dropper between each phase of 220 KV main bus-I &II and bus isolator including cutting bending of conductor alongwith spacers to & for shifting of material from store to site. There are 07 Nos. 220 KV bays, each bay have 01 No. bus isolator and 03 Nos. of jumper/dropper Thus total Nos. of jumper/droppers= 14x3=42.
To connect twin moose cross jumpers with spacers, P.G. clamps etc. among three sections of newly stringed 220 KV main bus-I &II including cutting, bending of conductor, shifting of material from store to site. There are 08 sections having cross jumpers at three places. Total No. of corss jumpers =8x3=24
PART-B (SUPPLY) Bolted type Single Tension fitting for twin moose conductor without turnbuckle.
Bolted type Single suspension fitting for twin moose conductor.
Spacer for twin moose conductor for 250 mm spacing.
Four Bolted type PG Clamp Moose to Moose Conductor.
Supply of Isolator Clamp for Single Moose Conductor.
TAJ ENTERPRISES
M/S AJAY TOMAR CONTRACTOR
TIRUPATI ELECTRICALS
Hi-tech power transmission
Gupta Elect and Engg Works
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid