| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.2 LAccepted-AOC | ₹77.2 L Quoted ₹77.3 L | L1 | Accepted-AOC Competent committee approved the tender in favour of Ist Lowest Bidder |
| 2 | L2₹85.8 LRejected-AOC | ₹85.8 L | L2 | Rejected-AOC Competent committee rejected the file due to higher rates |
| 3 | L3₹98.6 LRejected-AOC | ₹98.6 L | L3 | Rejected-AOC Competent committee rejected the file due to higher rates |
| Sl No | Description | Qty | Unit | M/S MEGHA ENTERPRISES L1 | M A ELECTRICALS L2 | M/S SUPER ENGINEERING TRADERS L3 |
|---|---|---|---|---|---|---|
| 1.00The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Shahjhanpur Road Bareilly Approx. distance upto 85 Km. Including safe loading and unloading. | ||||||
| 1.01 | PCC Pole 8.5 Mtr | 325 | Nos. | 900 ₹2.9 L | 1,000 ₹3.3 L | 700 ₹2.3 L |
| 1.02 | ACSR Weasal Conductor | 12,145 | Mtr | 4 ₹48,580 | 10 ₹1.2 L | 5 ₹60,725 |
| 1.03 | AB Cable 3x50 sqmm | 2,750 | Mtr | 4 ₹11,000 | 10 ₹27,500 | 6 ₹16,500 |
| 1.04 | AB Cable 3x95 sqmm | 5,673 | Mtr | 6 ₹34,038 | 10 ₹56,730 | 7 ₹39,711 |
| 1.05 | AB Cable 3x120 sqmm | 1,260 | Mtr | 8 ₹10,080 | 15 ₹18,900 | 8 ₹10,080 |
| 1.06 | 11/0.4 KV 3 Phase 250 KVA T/F | 7 | Nos. | 5,000 ₹35,000 | 4,000 ₹28,000 | 4,800 ₹33,600 |
| 1.07 | 11/0.4 KV 3 Phase 100 KVA T/F | 31 | Nos. | 4,000 ₹1.2 L | 3,000 ₹93,000 | 3,200 ₹99,200 |
| 1.08 | 11/0.4 KV 3 Phase 63 KVA T/F | 27 | Nos. | 3,500 ₹94,500 | 2,000 ₹54,000 | 3,100 ₹83,700 |
| 1.09 | 11/0.4 KV 3 Phase 25 KVA T/F | 12 | Nos. | 3,000 ₹36,000 | 1,000 ₹12,000 | 3,000 ₹36,000 |
Tender Value
₹77.7 L
EMD Value
₹77,690
Closing Date
22 Sept 2025, 5:00 pmClosed
SUPERINTENDING ENGINEER
ELECTRICITY DISTRIBUTION CIRCLE, KATJU MARG, BAREILLY
For Installation of New Distribution Transformer of Various Capacity at Various Places under Business Paln 2025-26 scheme under EDD-Shahjhanpur Road, Bareilly.
2025_MVVNL_1070828_3
11/EDCB/2025-26
Open Tender
Electrical Works
90 days
WORK
AS PER TENDER FORM
3 documents required · 3 mandatory
₹3,540
SE,EDC
₹77,690
29 Dec 2025
17 Sept 2025
23 Sept 2025
17 Sept 2025
22 Sept 2025
17 Sept 2025
Amount
The work of safe carriage of the following material from CB Ganj store center to work site under the jurisdiction of EDD-Shahjhanpur Road Bareilly Approx. distance upto 85 Km. Including safe loading and unloading.
PCC Pole 8.5 Mtr
ACSR Weasal Conductor
AB Cable 3x50 sqmm
AB Cable 3x95 sqmm
AB Cable 3x120 sqmm
11/0.4 KV 3 Phase 250 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 25 KVA T/F
LT Cable 1x120 sqmm
LT Cable 1x240 sqmm
LT Cable 1x400 sqmm
LT Cable 3.5x70 sqmm
Other Line material i.e., 33 KV & 11 KV pin insulater/stay/earthing complete/Disc Fitting/Disc Insulators/Dropper Channel/Crossing Bracing/ Top Channel/Binding Wire/Danger Board/Barbed Wire/numberplate/stone pad/Control Cable etc
Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect
Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5'(L)x5'(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
Mounting of 250 KVA T/F Transformers as per norms complete in all respect -
Mounting of 100 KVA T/F Transformers as per norms complete in all respect -
Mounting of 63 KVA T/F Transformers as per norms complete in all respect -
Mounting of 25 KVA T/F Transformers as per norms complete in all respect -
Fabrication & Installation of 11 KV Fuse set comptele unit to be installed on midway of 11 KV Double Pole Structure Complete in all respect
Installation of LT Fuse Box With SMC Box Complete in all respect
Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms
PCC Pole 8.5 Mtr (Single)
PCC Pole 8.5 Mtr (Double)
Laying of LT Cable 1x120 sq mm complete in all respect
Laying of LT Cable 1x240 sq mm complete in all respect
Laying of LT Cable 1x400 sq mm complete in all respect
Laying of LT Cable 3.5x70 sq mm complete in all respect
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Laying, Stringing & Sagging of Following Conductor complete in all respect
ACSR Weasal Conductor
AB Cable 3x50 sqmm
AB Cable 3x95 sqmm
AB Cable 3x120 sqmm
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Fixing of 3 Pahse Distribution Box complete in all respect
Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost)
Holding Clamp for S/s
F Clamp With Nut & Bolt
X Arm Holding Clamp with N&B
PG Clamp
Stone Pad 300x300x75 mm
Danger Board With Clamp
Barbed Wire
Distribution Box Clamp
Piercing Connector
Suspension Clamp
J Hook
Dead End Clamp
Eye Hook
LT Clamp with Nut & Bolt
LT T OFF
Aluminium Lug 70 sqmm with Nut&Bolt
Aluminium Lug 240 sqmm with Nut&Bolt
Aluminium Lug 400 sqmm with Nut&Bolt
Stay Clamp
Stay Insulator
Earthwire Clamp
E Bracket With Nut & Bolt
3 Phase 4 Wire LT Fuse Box with SMC Box
11 KV Fuse Set Complete (11 KV DO Fuse Set- 1 Nos, MS Channel 100x50x2028mm-1 No., Holding Clamp with n&B-2 Nos, Al Lug 70 Sqmm-9 Nos)
LT Shackle Insulator
Cost of Nut & Bolt for Shackle Insulator
Tail Less Unit 630 Amp.
Copper "L" Piece 50x225x10 mm For Tail less Unit
11 KV Disc Fitting (45 KN)
M A ELECTRICALS (BID ID -5551997)
M/S SUPER ENGINEERING TRADERS (BID ID -5543214)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid