Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC NO 2 13 1ST PHASE PEENYA INDUSTRIAL AREA PEENYA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | ₹1.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.2 Cr+₹77.7 L (55.1%)Rejected-AOC | ₹2.2 Cr+₹77.7 L (55.1%) | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
31 Jul 2023, 1:00 pmClosed
HOD- TSP
TSP UNIT, KMML, CHAVARA
Supply erection testing and commissioning of vacuum ladle for setting up 70 TPA Magnesium Recycling Technology Demonstration Plant
2023_KMML_581727_1
TSP/MRP/PROJ/VL/PKG-8
Open Tender
Miscellaneous Works
Supply and Service
180 days
TSP UNIT, KMML, CHAVARA
See tender details
2 documents required · 2 mandatory
₹29,500
₹2 L
TSP UNIT, KMML, CHAVARA
23 Nov 2023
16 Jun 2023
1 Aug 2023
16 Jun 2023
31 Jul 2023
16 Jun 2023
16 Jun 2023 - 31 Jul 2023
27 Jun 2023
45 KW VACUUM LADDLE FURNACE ASSEMBLY
Lumpsum price for Design,detailed engineering,drawing / document preparation and submission for approval, procurement of raw materials, manufacturing / fabrication / assembly, stagewise inspection, testing, painting, supply, transportation, unloading at site, erction and commissioning, performace testing, demonstration of performance at site, qualification and warranty of vacuum ladle assembly comprising 45 KW electric resistance heating furnace along with SS cladded crucible (1 no), support stand (1 no) with load cells for weighing molten metal collection including spares as per the TPS 8165 - 01 - PS - 005 The scope of the supply also includes all auxiliaries such as vacuum pumps(2 nos) intermediate facilities required prior to pump for solid removal and temperature reduction of the gas coming out from the laddle, connecting piping and flanges( between cell and ladle, pump and ladle), electrical and instrumentation as per the TPS and attached drawings.
SUPERVISORY SERVICES (if required after completion of project) Supervisory services for erection * per diem rate for engineer and supervisor ** number of days required for supervision shall be filled by bidder (breakup for engineer / supervisor days also shall be given)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .