| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.9 LAccepted-Finance | L-1 | Accepted-Finance Due to L-1 | |
| 2 | L-2₹2.1 L+₹19,013 (9.77%)Rejected-Finance | L-2 | Rejected-Finance Due to L-2 |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
30 Nov 2023, 10:00 amClosed
Director CSIR-CBRI
Roorkee
2023_CSIR_175208_1
193(631)EST/2023-24
Open Tender
Civil Works
Item Rate
30 days
Director CSIR-CBRI Roorkee
9 documents required · 9 mandatory
₹590
Director CSIR-CBRI
₹4,100
7 Dec 2023
21 Nov 2023
1 Dec 2023
21 Nov 2023
30 Nov 2023
21 Nov 2023
Amount
Earth Work in excavation by mechanical / manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm. on plan) including dressing sides and ramming of bottoms, lift up to 1.5 including getting out the excavated soil as directed.All kinds of soils
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams suspended floors roofs having slope up to 15 landings balconies, shelves, chajjas, lintels, bands, plain window sills, stair cases up to floor five level excluding cost of centering, shuttering, finishing and Reinforcement.(1 cement :1.50 coarse sand :3 graded stone aggregate 20mm nominal size)
Centering shuttering i/c strutting, propping etc. and removal of from for.
Foundation and footing
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Reinforcement for RCC work i/c straightening, cutting bending, placing in position and binding all complete. Cold twisted bars
Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 ement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) :300 mm dia piles
M/s Atul Kumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .