Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC 19 LAKE TEMPLE ROAD KOLKATA 700 029 | KOLKATA | KOLKATA | WEST BENGAL | 700029 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹19.8 L+₹1.2 L (6.27%)Rejected-Finance 33 1 NETAJI SUBHAS ROAD 6TH FLOOR ROOM NO 616 KOLKATA 700001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance Second lowest(L2) | |
| 3 | Not Admitted-Fee/PreQual/Technical B 71 ASHISH ROW HOUSE 395009 RANDER SURAT GUJARAT 395009 | SURAT | GUJARAT | 395009 | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
₹23.2 L
EMD Value
₹46,440
Closing Date
18 Jun 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director VECC
1/AF Bidhan Nagar, Kolkata64
Dismantling of old AHUs 6 and 7, Supply and installation of new AHUs for control room and corridors of K130 Cyclotron
2022_VECC_691987_1
VECC/ESD/AC/NIT/976 DATED 30/05/2022
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
180 days
VECC Kolkata
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹46,440
13 Sept 2022
1 Jun 2022
21 Jun 2022
2 Jun 2022
18 Jun 2022
5 Jun 2022
2 Jun 2022 - 14 Jun 2022
120 days
Amount
LOCATION: VECC SALT LAKE CAMPUS.
Dismantling of 2 nos. Air-Handling Units (AHU) capacity 40 TR each, including chilled water supply and return MS pipelines connecting AHU. Complete dismantling of AHU body panels, fan section, filter section and coil section using gas cutting etc. Removing of chilled water connection inside the room including thermocoal plaster insulation and duct connection etc. Scrap all the material in the VECC Store scrapyard after cleaning the room completely. All kinds of tools tackles, attachment and expert riggers required for job will be deployed by the contractor/bidder for safe disposal of material.
Supply, Installation, Testing Commissioning (SITC) of 40TR Floor mounted Air Handling Unit (AHU). Detail as per WS-5 and Annexure-I.
Supply and fabrication of 80 mm MS chilled water pipeline confirming IS1239 (Heavy class) connecting the cooling coils headers of above AHUs including cutting, welding, fixing of pipelines and existing valves, all kind of fittings and fixtures etc. required for installation as per site with complete thermal insulation of 80 mm MS Chilled water pipeline and valves after applying cold bitumen and then CPRX adhesive compound on the surface and laying the 50mm thick Thermo-coal (Expanded Polystyrene) pipe shape (with pieces of Thermo-coal for valves) using TF quality Thermo-coal (min. 15-16 Kg/M³). Cover the pipeline with vapour barrier and chicken mesh. After this whole assembly should be smoothly plastered by 12 mm thick sand and cement (4:1) plaster, with good surface finish and suitable painting (with one coat primer and two coat first quality synthetic enamel paint of approved colour). Also suitable fittings for connections of in/out pressure gauges and thermowells ( For Thermometer) should be provided in supply and return lines.
Supply and installation of 12 mm SS304 ball valves confirming to BS 5351, Class 150 in supply and return chilled water lines of AHUs for purging cock and drain point including all kind of fittings required for proper installation.
Supply and installation of Pressure gauges (Range: 0 to 7 kg/cm2) with SS304 ball valves confirming to BS 5351, Class 150 and in supply and return chilled water lines for AHUs including all kind of fittings required for proper installation. Detail as per WS-5.
Design, fabrication & installation of ducting made by using 22 SWG GI sheet confirming standard IS277: 2003; and proper connections with AHU dampers, including all kinds of fittings, fixtures, MS angle rod, fastener, etc. as required for the installation as per site suited condition with complete thermal insulation of ducting after applying cold bitumen and then CPRX adhesive compound on the surface and laying the 50mm thick Thermo-coal (Expanded Polystyrene) duct shape using TF quality Thermo-coal (min. 15-16 Kg/M³). Cover the ducting with vapor barrier and chicken mesh. After this whole assembly should be smoothly plastered by 12 mm thick sand and cement (4:1) plaster, with good surface finish and suitable painting (with one coat primer and two coat first quality synthetic enamel paint of approved color).
Supply, fabrication and installation of Inside Acoustic insulation of the duct with 12.5 mm fiberglass rigid board covering with perforated min. 32 gauge Aluminium sheet, properly duct lined from inside including all type fixtures etc. required for installation.
Supply & Installation of motorized Ultra Low Leakage (ULL) dampers suitable as per AHU outlet size between the duct connection and AHU outlet. Including flexible cloth connection between duct and damper with necessary power connection using on/off switch (will be provided near the AHU) and suitable cable from damper to electrical switch. Complete installation of damper motor, actuator and required control panels etc. Detail as per WS-5 and Annexure-I .
Supply and fixing 40mm hard drain pipeline using the UPVC pipelines and fittings confirming to ASTM D1785, Schedule 40. Making a syphon (U trap) just outside of the AHU drain point including proper routing, fixing (required fixtures) etc. for installation as per requirement of site.
Supply and installation of VFD for AHUs and required panels for VFD accommodating VFD & suitable MCCB in each panel including other associated electrical/electronic accessories suitable to VFD rating as required. Detail as per WS-5 and Annexure-I.
Supply, laying and connection of suitable copper electrical cable from AHUs to VFD panels with perforated GI cable tray and suitable earthing for providing the electrical power from VFD to AHU. Detail as per WS-5 and Annexure-I.
Supply, installation and connection of temperature control instruments like temperature sensors, Digital temperature transmitter, Digital temperature controller or any other equipment required to control the set temperature using VFD, including control wiring with suitable cable, earthing, fixtures support etc. as required for proper temperature control. Detail as per WS-5 and Annexure-I.
EVAC ENGINEERING PROJECTS PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .