| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.4 LRejected-AOC | ₹4.4 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | MUSTHAFA T L2 | Nasar L1 |
|---|---|---|---|---|---|
| 1.00Drinking water scheme | |||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 2.23 | cum | 2,669.1 ₹5,938.75 | 2,539.2 ₹5,649.72 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 7.07 | cum | 377.71 ₹2,668.52 | 359.32 ₹2,538.60 |
| 1.00 | OD460095/2025-2026:Modified Dta-60.7.8 (DAR- 2018)-DR with Departmental Stone- DRY RUBBLE MASONRY- Dry rubble without concrete levellin cousre using departmental rubble including packing to compactness to lines and level, labour chrges etc complete as per direction of Departmental officers at site | 1.98 | cum | 1,801.67 ₹3,563.70 | 1,713.99 ₹3,390.27 |
| 1.00 | OD460097/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 9.74 | cum | 4,193.13 ₹40,836.89 | 3,989.07 ₹38,849.55 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.85 | cum | 9,697.77 ₹17,979.67 | 9,225.81 ₹17,104.65 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 0.49 | cum | 8,099.22 ₹3,936.22 | 7,705.06 ₹3,744.66 |
| 1.01 | 13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand). | 4.93 | sqm | 371.29 ₹1,829.72 | 353.22 ₹1,740.67 |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 21.98 | sqm | 420.49 ₹9,242.37 | 400.03 ₹8,792.66 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 43.96 | sqm | 173.1 ₹7,609.48 | 164.68 ₹7,239.33 |
Tender Value
₹4.2 L
EMD Value
₹10,590
Closing Date
20 Feb 2026, 11:00 amClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER KARIMPUZHA GP
Karimpuzha GP-Improvements Of Drinking Water Scheme At Various AnganavadiES in Karimpuzha GP-276/26
2026_LSGD_835840_5
07/AE/LIDEW/KGP/2025-26
Open Tender
Civil Works - Others
KARIMPUZHA GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,590
Yes
28 May 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Drinking water scheme
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD460095/2025-2026:Modified Dta-60.7.8 (DAR- 2018)-DR with Departmental Stone- DRY RUBBLE MASONRY- Dry rubble without concrete levellin cousre using departmental rubble including packing to compactness to lines and level, labour chrges etc complete as per direction of Departmental officers at site
OD460097/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD460330/2025-2026:Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
50.18.9.16.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 50 mm dia 6Kgf/cm2 - External work - Exposed on wall
50.18.9.13.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10 Kgf/cm2- External work - Exposed on wall
50.18.7.4.2:Providing and fixing PVC, pipes fittings including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 6 Kgf/cm2 - internal work- Exposed on wall
17.10.1.2:Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS 13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required: Kitchen sink with drain board510x 1040 mm bowl depth 225 mm
18.54.1:Providing and fixing PTMT bib cock of approved quality and colour.15 mm nominal bore, 86 mm long, weighing not less than 88 gms
18.48:Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.
18.17.2:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :32 mm nominal bore
OD460981/2025-2026:Engaging labour
OD460999/2025-2026:Supplying and erecting Open well submersible pump with motor using best quality, ISI marked motor and pump to suit the well, including cost of column pipe(UPVC), UG cable, Nylon rope, and all other fitting to including panel board etc and all charges for conveyance of materials, labour, and cost of wiring (KSEBcharges for electrical connection paid seperately) etc. complete
17.7.3:Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require:White Vitreous China Wash basin size 550x400 mm with a pair of 15 mm C.P. brass pillar taps
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1406787.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1406787.xls
BOQ • 0.31 MB
PR.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.63 MB
FOT.pdf
Tender Documents • 0.02 MB
AFF.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid