Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.8 CrAccepted-AOC AT A M 30 VSS NAGAR P O RASULGARH | BHUBANESWAR | KHORDHA | ODISHA | 751010 | 1 | Accepted-AOC L1 | |
| 2 | 2₹15.0 Cr+₹12.0 L (0.81%)Rejected-Finance 1798 SECTOR 60 SAS NAGAR MOHALI 144102 PB | MOHALI | MOHALI | PUNJAB | 144102 | 2 | Rejected-Finance NOT BEING L1 | |
| 3 | 3₹15.5 Cr+₹70.1 L (4.73%)Rejected-Finance HOUSE NO 20 GRANDMARK COLONY PO PS TAMANDO BHUBANESWAR KHORDHA 751028 | BHUBANESWAR | KHORDHA | ODISHA | 751028 | 3 | Rejected-Finance NOT BEING L1 | |
| 4 | 4₹15.6 Cr+₹75.6 L (5.10%)Rejected-Finance AT MANIKHAMB P O MOTIGANG DIST BALASORE 756003 | BALASORE | BALASORE | ODISHA | 756003 | 4 | Rejected-Finance NOT BEING L1 | |
| 5 | 5₹16.1 Cr+₹1.3 Cr (8.46%)Rejected-Finance 75 J N ROAD HADDO PORT BLAIR SOUTH ANDAMAN PORT BLAIR 744102 | PORT BLAIR | SOUTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744102 | 5 | Rejected-Finance NOT BEING L1 |
Tender Value
₹16.6 Cr
EMD Value
₹16.6 L
Closing Date
23 Nov 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CGM(C), OMC Ltd.
Office of the CGM(C), OMC Ltd., Bhubaneswar
Construction of New DDM office, Analytic Lab, SPU along with Robotic Lab at Joda in the district of Keonjhar.
2023_OMC_96328_1
NIT No.47/OMC/CIVIL/2023
Open Tender
Civil Works - Buildings
Percentage
425 days
JODA
RC, EPF Regd., GSTN, PAN, Registration in CDMS portal, Affidavits, experience, etc. as per DTCN requirements.
2 documents required · 2 mandatory
₹11,800
₹16.6 L
Yes
29 Mar 2024
4 Nov 2023
24 Nov 2023
4 Nov 2023
23 Nov 2023
4 Nov 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.001 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders (except sheet rocks and boulders requiring for blasting) including dressing and leveling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. | 5,150 | Cum | 301.8 | ₹15,54,270 |
| 1.002 | Filling foundation and plinth with excavated earth or good earth and compact with well watering and ramming cost of all labour,T &P required for the work complete in all respect as per direction of EIC. | 4,520 | Cum | 167.7 | ₹7,58,004 |
| 1.003 | Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. | 881 | Cum | 1,071 | ₹9,43,551 |
| 1.004 | C.C of prop. (1:4:8) in foundation using 40mm. Size broken hard granite metal of approved quality from approved quarry including lowering,laying concrete to required levels laid in layers not exceeding 150mm thick including cost,conveyance,royalities of all materials,cost of all labour,T & P required for the work etc.required to complete as per direction of EIC. | 289 | Cum | 6,017.2 | ₹17,38,970.8 |
| 1.005 | P.C.C. of prop. (1:3:6) in foundation using 40 mm. size broken hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including cost, conveyance, royalties of all materials, watering and curing and cost of all labour, T&P required for the work etc. compleete as per direction of EIC. | 174 | Cum | 6,384.6 | ₹11,10,920.4 |
| 1.006 | 2.5 Cm (1") thick DPC with C.C. (1:2:4) at plinth level using 12mm size hard broken granite crusher broken chips including side shuttering at required level, watering and curing, including cost, conveyance, royalties of all materials and cost of all labour, T&P scaffolding etc required for the work complete as per the direction of EIC | 120 | Sqm | 340.7 | ₹40,884 |
| 1.007 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills
- in Ground floor Foundation | 756.22 | Cum | 7,073.5 | ₹53,49,122.17 |
| 1.008 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills
- in Ground floor Plinth Beam | 99.15 | Cum | 7,892.2 | ₹7,82,511.63 |
| 1.009 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills - in Ground floor Column | 71.32 | Cum | 14,813.2 | ₹10,56,477.42 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_470494.xls
BOQ Document • 0.76 MB
132810696.pdf
Tender Document • 0.54 MB
SBD_1.pdf
Tender Document • 1.89 MB
TENDER_DRAWING_JODA.rar
Tender Document • 17.76 MB
132810698.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .