| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | ₹14.4 L | L1 | Accepted-AOC WORK AWARDED |
| 2 | L2₹15.1 L+₹75,619.74 (5.26%)Rejected-Finance | ₹15.1 L+₹75,619.74 (5.26%) | L2 | Rejected-Finance BID RANK L2 |
| 3 | L3₹15.5 L+₹1.2 L (8.18%)Rejected-Finance GOVT CONTRACTOR | ₹15.5 L+₹1.2 L (8.18%) | L3 | Rejected-Finance BID RANK L3 |
| 4 | L4₹16.2 L+₹1.8 L (12.6%)Rejected-Finance | ₹16.2 L+₹1.8 L (12.6%) | L4 | Rejected-Finance BID RANK L4 |
| 5 | L5₹16.8 L+₹2.4 L (16.6%)Rejected-Finance VILLAGE P O JASSAI TEHSIL BAROH DISTRICT KANGRA H P | ₹16.8 L+₹2.4 L (16.6%) | L5 | Rejected-Finance BID RANK L5 |
Tender Value
₹20.0 L
EMD Value
₹40,000
Closing Date
17 Jul 2026, 10:00 amClosed
EE HPPWD DIVISION BHAWARNA
EE HPPWD DIVISION BHAWARNA
SH Formation cutting in km. 0/630 to 0/795, C/O 0.60mtr span culvert at RD. 0/280, 0/320 and 0/790 and P/L CC work in km. 0/0 to 0/510) (Under MMSY deposit
2026_PWD_138435_7
2737-46 dated 06-07-2026 Bhawarna
Open Tender
Civil Works - Roads
Percentage
180 days
BHAWARNA
Please refer Tender documents.
13 documents required · 13 mandatory
₹500
₹40,000
22 Sept 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kind of soil by mannual/mechanical means including saturated soil comprising of ordinary soil, soft rock, hard rock, chieselling, wedging out of rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling fine dressing and carriage of machineries, materials, tools, equipment and safety measured and other incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones to the tune of 14.66 cubic metre quantity at the rate of Rs. 300/- per cum shall be effected from the contractor's running bill on Pro-rata basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be compensated by him in all cases. The rate is including octroi, royality, Malkana. toll tax, GST or other taxes imposed by the Government. | - | Per Cubic metre | 156 | - |
| 2 | Earth work in excavation for foundation of structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks ( Where blasting is prohibited) as per drawings and M.O.R.D. technical specification section 300 and 1600 as per direction of the Engineer- In – Charge including setting out, shoring and bracing , removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm ( one hundred fifty millimeter) compacted thickness of each layers including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth and any quantum of water including cleaning of slush which may arrise out during dewatering as per entire the satisfaction and the direction of Engineer-in-Charge. Including carriage of materials within all leads, lifts and other incidental . The rate is including octrai, royality, Malkana. toll tax, sale tax, GST or other taxes imposed by the Government. | 11.34 | Per Cubic metre | 250 | ₹2,835 |
| 3 | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundations for all types of structure complete of plain cement concrete nominal mix 1:3:6 (one cement :Three sand :Six graded crushed /broken stone aggregate 20 mm (Twenty Millimeters) nominal size on ground or under water including curing complete, pumping or bailing out water ,dewatering removal of slush as required at site which may arise at the time of laying concrete complete for all heights/depths including the cost of form work in drain as per drawings and MORD technical specifications section 800, 900 and 1200 and as per the direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidentals. The rate is including octrai, royality, Malkana. toll tax, sale tax, GST or other taxes imposed by the Government. | 1.89 | Per cubic metre | 4,950 | ₹9,355.5 |
| 4 | Providing and laying mechanically mixed and vibrated concrete for plain cement concrete in sub-structure for all type of structure complete nominal mix 1: 2 ½ :5 ( One cement : two point five sand : five graded crushed/ broken stone aggregate 20mm (twenty millimetre) nominal size) on ground or under water and curing complete including pumping or bailing out water , dewatering removal of slush as required at site which may arrise at the time of laying concrete complete for all heights/ depths in abutments, parapet etcetera and the like including the cost of form work as per drawings and M.O.R.D. technical specification section 800, 900 and 1200 as per direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 4.32 | Per Cubic metre | 5,500 | ₹23,760 |
| 5 | Providing and laying mechanically mixed and vibrated plain cement concrete Grade- M-20 (M-Twenty) nominal mix 1:2:4 (one cement : two sand : four graded crushed stone aggregate 40mm (forty millimeter) nominal size in bed block & dirt wall as per drawing and M.O.R.D. technical specifications clause 802, 803, 1202 and 1203, including the cost of form work, curing complete and hauling of materials in all kinds of leads, lifts and other incidental and as per the entire satisfaction and directions of Engineer-in-Charge. The rate is including of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 1.08 | Per Cubic metre | 6,000 | ₹6,480 |
| 6 | Providing and laying mechanically mixed and vibrated reinforced cement concrete in super structure as per drawing and M.O.R.D. technical specification section 800, 900 & 1400 RCC Grade M-25 (M- twenty five) designed mix with minimum cement contents not less than 400 (Four hundred) Kilogram per cubic meter with 20mm (Twenty millimeter) nominal size grade crushed stone aggregate and curing complete including cost of form work, but excluding the cost of reinforcement for reinforced cement concrete work in slab & wheel guard etcetera as per the direction of Engineer-in-charge including carriage of material within all leads, lifts and other incidental. The rate is including of octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 1.35 | Per Cubic metre | 7,000 | ₹9,450 |
| 7 | Supplying, fitting and placing HYSD bar reinforcement in super structure complete with straightening, bending, binding of bars including the cost of binding wire in all heights / depths as per drawing and MORD technical specification section 1000 and 1400 and as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidentals. The rate is including octroi, royality, Malkana, tolltax, GST or other taxes imposed by the government. | 1 | Per Kilogram | 95 | ₹94.91 |
| 8 | Stone soling properly hand-packed filling interstices with spalls and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm (Hundred millimetre) spread thickness (finished work including materials and labour) complete as per the direction of Engineer-in-charge including carriage of material within all leads, lifts and other incidental. The rate is including of octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 192.15 | Per Cubic metre | 1,000 | ₹1,92,150 |
| 9 | Providing and laying mechanically mixed and vibrated reinforced cement concrete Grade- M-25 (M-Twenty Five) in open foundation design mix with cement contents not less than 400 kg (Four hundred kilogram) per cubic metre using graded crushed stone aggregate 20mm (twenty millimetre) nominal size complete as per drawings and MORD technical specification section 800, 900 and 1400, including the cost of form work and curing complete including hauling of materials with in all leads, lifts and other incidental and as per the entire satisfaction and directions of Engineer-in-Charge. The rate is including of octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 244.19 | Per Cubic metre | 7,000 | ₹17,09,330 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tendernotice_2.pdf
PDF • 0.61 MB
SBD7.pdf
Tender Documents • 5.56 MB
BOQ_205088.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .