Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 Cr+₹4.1 L (2.67%)Rejected-Finance | ₹1.6 Cr+₹4.1 L (2.67%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 Cr+₹15.9 L (10.4%)Rejected-Finance NANDNI VIHAR ADHOIWALA DEHRADUN | ₹1.7 Cr+₹15.9 L (10.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.0 Cr+₹50.0 L (32.7%)Rejected-Finance WARD NO 19 BRAHMNAGAR GAFI NO 2 ROBERTSGANJ DIST SONBHADRA | ROBERTSGANJ | SONBHADRA | UTTAR PRADESH | ₹2.0 Cr+₹50.0 L (32.7%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.1 Cr+₹53.6 L (35.1%)Rejected-Finance VILLAGE KAIRWAN KARANPUR PO RAJPUR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹2.1 Cr+₹53.6 L (35.1%) | L5 | Rejected-Finance L5 |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
11 Oct 2021, 5:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Construction Circle UKPJN Dehradun
Supply and Laying and Jointing of pipe line Distribution mains of different diameter HDPE pipes and providing household connection and its appurtenants works in Atmalpur Bongla water supply scheme
2021_MDPEY_36458_1
Letter No. 4537/NIVIDA/288 dt 09.09.2021
Open Tender
Civil Works
Item Rate
270 days
Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer Construction Division UKPJN
₹3.4 L
Haridwar
19 Oct 2023
14 Sept 2021
13 Oct 2021
15 Sept 2021
11 Oct 2021
19 Sept 2021
17 Sept 2021
Amount
Pipe Line Work Supply of DI K-7 Pipe pipe including laying jointing including supply of rubber gescker Field testing, commissioning completed, transpotation, loading, unloading & stacking etc.
D I Specials
Supply of HDPE pipe including laying jointing Field testing,commissioning complete at site of HDPE (pe100 grade compound)pipe as per IS 4984 and specifications for water application including all cost of material, labourrequired,transpotation,loading,unloading& stacking etc.
Supply, carting and fixing in position of following CI D/F sluice / Gate valve for flow regulation & scouring including cost of valve specials, labour & T&Pcomplete.
C.I. D/F Sluice Valves Confirming to IS: 14846-2000 ( Kirloskar or equivalent) of Pressure PN 1.0
Air valve 25 mm dia
Excavation of pipe line in soil mixed with course sand, shingle, kankar, including refilling of trenches after laying of pipe line including watering ramming etc.
House Hold connection including all material etc complete. Taking 100 % connection in initial Stage.
Dismantling of following type of road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials.
Cement concrete road
Reinstatement of following type of road surfaces after laying of pipe line including supply of all material ,labour,T&P etc complete.
Cement concrete road
Construction of following chambers
(i) Sluice valve/ wheel valve chamber(90X90X100)
(ii) Air valve chamber / Fire Hydrant chamber
M/S VIDDUT KUMAR JAIN
ESPY ASSOCIATES
S. M. Construction
SAKLA NAND LAKHERA
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .