| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.9 LAccepted-Finance | 1 | Accepted-Finance ok | |
| 2 | 2₹27.7 L+₹3.9 L (16.2%)Accepted-Finance | 2 | Accepted-Finance ok | |
| 3 | 3₹27.8 L+₹3.9 L (16.4%)Accepted-Finance | 3 | Accepted-Finance ok | |
| 4 | Rejected-Technical | - | Rejected-Technical TENDER FEE NOT SUBMITTED |
Tender Value
₹23.9 L
EMD Value
₹47,780
Closing Date
25 Jul 2022, 2:00 pmClosed
EXECUTIVE ENGINEER JPDCL ELECTRIC DIVISION RAJOURI
Office of Executive Engineer, JPDCL, Electric Division, Rajouri
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING ON TURKEY BASIS UNDER B2V3 FOR CREATION OF 4X63 KVA SUB STATION PANCHAYAT-BADHOON-A, BADHOON-B, AUGMENTATION AT NALLA TUNANI AND IMPROVEMENT OF HT/LT NETWORK AT BINDI, PANCHAYAT- BADHOON-B
2022_PDD_174348_1
EDR/21 of 2022-23 Dated 16/06/2022
Open Tender
Electrical Works
Turn-key
60 days
BADHOON
AS PER NIT AND SBD
3 documents required · 3 mandatory
₹1,000
EXECUTIVE ENGINEER JPDCL ELECTRIC DIVISION RAJOURI
₹47,780
30 Aug 2022
16 Jun 2022
27 Jul 2022
16 Jun 2022
25 Jul 2022
17 Jun 2022
Amount
QUOTED TOTAL OF RESPECTIVE BOQ TO BE ENTERED
SCHEDULE-A (BOQ2)
SCHEDULE-B (BOQ3)
SCHEDULE-C (BOQ4)
SCHEDULE-D (BOQ5)
SCHEDULE-E (BOQ6)
SCHEDULE-F (BOQ7)
Description of Work / Item(s)
Amount
11 KV (HT) Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. (As per recommended IS/REC Standard)
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV DISC WITH FITTINGS( 45 KN) (As per recommended IS/REC Standard)
Pole Earthing Complete by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm dia, 2.5 mtr long through GI Strip (25x3) to each HT pole including supply and welding of GI channel 70x40x6 mm on pole for earth connection (As per recommended IS/REC Standard)
Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete.
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.01
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. NOTE: Please refer Pole drawings for details (As per recommended IS/REC Standard)
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Fixing of 11 kV Disc Insulator with fitting (polymer) with Pins (45 KN) (As per recommended IS/REC Standard)
Fixing of Pole Earthing Complete by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm dia, 2.5 mtr long through GI Strip (25x3) to each HT pole including supply and welding of GI channel 70x40x6 mm on pole for earth connection (As per recommended IS/REC Standard)
Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
11/0.433 kV Distribution Transformer (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site of 11/0.433 kV Distribution Transformer.
63 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
8 Mtr. Long ST Poles (410 SP-15) (As per recommended IS/REC Standard)
Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
185 mm sq Cable PVC FRLS with Al Thimbles
Galvanized Nuts and Bolts of sizes.
Sub station earthing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm for 1 No. Neutral Earthing and through GI Strip of 25X3 mm for 2 Nos transformer body Earth, 2 Nos Pole Earth, 1 No. LA Earth and 1 No. GO handle Earth (Note: For LA Earth 1 pipe/rod shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and GI Clamps. (As per recommended IS/REC Standard)
AL PAINT + RED OXIDE.
Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
Erection/Installation, Testing and commisioning of material supplied at Sl. No-3.01
Installation of 63kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Installation of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
Installation of 11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
Installation of 11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
Fixing / Crimping of 185 mm sq Cable PVC FRLS with Al Thimbles
Fixing of Galvanized Nuts and Bolts of sizes.
Excavation of Earthing Pits of dia = 650 mm and depth= 3000 mm, Installation and fixing of Sub station earthing as per REC approved arrangement/spacing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm 1 no for neutral earthing and 25X3 mm for 2 Nos transformer body earth, 2 Nos Pole earth, 1 no. LA Earth and 1 no. GO handle earth). (Note: For LA Earth 1 pipe shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and Clamps. Refilled with earth enhancement materials and earthing chamber made of brick masonary with RCC Slab Cover (Proper Earthing Value must be insured) (As per recommended IS/REC Standard)
Painting of pole by 01 coat of Red Oxide & 02 Coats of Aluminium.
Fixing of Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
LT Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Mukky clamps with LT Shackle insulators (polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-5.1
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing of GI Mukky clamps with LT Shackle insulators(polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
Fixing of GGalvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
Description of Work / Item(s)
Amount
11/0.433 kV Distribution Transformer (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site of 11/0.433 kV Distribution Transformer.
63 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
120 mm sq Cable PVC FRLS with Al Thimbles
Galvanized Nuts and Bolts of sizes.
Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.1
Installation of 63 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
Installation of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Fixing / Crimping of 120 mm sq Cable PVC FRLS with Al Thimbles
Fixing of Galvanized Nuts and Bolts of sizes.
Fixing of Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
Description of Work / Item(s)
Amount
11 KV (HT) Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. (As per recommended IS/REC Standard)
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV DISC WITH FITTINGS( 45 KN) (As per recommended IS/REC Standard)
Pole Earthing Complete by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm dia, 2.5 mtr long through GI Strip (25x3) to each HT pole including supply and welding of GI channel 70x40x6 mm on pole for earth connection (As per recommended IS/REC Standard)
Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete.
AL PAINT + RED OXIDE.
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.01
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. NOTE: Please refer Pole drawings for details (As per recommended IS/REC Standard)
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Fixing of 11 kV Disc Insulator with fitting (polymer) with Pins (45 KN) (As per recommended IS/REC Standard)
Fixing of Pole Earthing Complete by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm dia, 2.5 mtr long through GI Strip (25x3) to each HT pole including supply and welding of GI channel 70x40x6 mm on pole for earth connection (As per recommended IS/REC Standard)
Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)
Painting of poles with one coat of red oxide & 02 coats of silver oxide (As per recommended IS/REC Standard).
Fixing of Galvanized Nuts and Bolts of sizes.
11/0.433 kV Distribution Transformer (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site of 11/0.433 kV Distribution Transformer.
63 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
8 Mtr. Long ST Poles (410 SP-15) (As per recommended IS/REC Standard)
Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
120mm sq Cable PVC FRLS with Al Thimbles
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV Disc Insulators (polymer) Complete with fitting (45 KN) (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Sub station earthing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm for 1 No. Neutral Earthing and through GI Strip of 25X3 mm for 2 Nos transformer body Earth, 2 Nos Pole Earth, 1 No. LA Earth and 1 No. GO handle Earth (Note: For LA Earth 1 pipe/rod shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and GI Clamps. (As per recommended IS/REC Standard)
AL PAINT + RED OXIDE.
Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
Erection/Installation, Testing and commisioning of material supplied at Sl. No-3.01
Installation of 63kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Installation of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
Installation of 11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
Installation of 11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Fixing / Crimping of 120 mm sq Cable PVC FRLS with Al Thimbles
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Installation of 11 kV Disc Insulators (polymer) Complete with fitting( 45 KN) (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
Excavation of Earthing Pits of dia = 650 mm and depth= 3000 mm, Installation and fixing of Sub station earthing as per REC approved arrangement/spacing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm 1 no for neutral earthing and 25X3 mm for 2 Nos transformer body earth, 2 Nos Pole earth, 1 no. LA Earth and 1 no. GO handle earth). (Note: For LA Earth 1 pipe shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and Clamps. Refilled with earth enhancement materials and earthing chamber made of brick masonary with RCC Slab Cover (Proper Earthing Value must be insured) (As per recommended IS/REC Standard)
Painting of pole by 01 coat of Red Oxide & 02 Coats of Aluminium.
Fixing of Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
LT Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Mukky clamps with LT Shackle insulators (polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
AL PAINT + RED OXIDE.
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-5.1
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing of GI Mukky clamps with LT Shackle insulators(polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
PAINTING OF POLE WITH 01 COAT OF RED OXIDE & 02 COATS OF AL. PAINT.
Fixing of Galvanized Nuts and Bolts of sizes.
Description of Work / Item(s)
Amount
11 KV (HT) Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. (As per recommended IS/REC Standard)
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
AL PAINT + RED OXIDE.
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.01
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. NOTE: Please refer Pole drawings for details (As per recommended IS/REC Standard)
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Painting of poles with one coat of red oxide & 02 coats of silver oxide (As per recommended IS/REC Standard).
Fixing of Galvanized Nuts and Bolts of sizes.
LT Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Mukky clamps with LT Shackle insulators (polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
AL PAINT + RED OXIDE.
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-3.1
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing of GI Mukky clamps with LT Shackle insulators(polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
PAINTING OF POLE WITH 01 COAT OF RED OXIDE & 02 COATS OF AL. PAINT.
Fixing of Galvanized Nuts and Bolts of sizes.
Description of Work / Item(s)
Amount
11 KV (HT) Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. (As per recommended IS/REC Standard)
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV DISC WITH FITTINGS( 45 KN) (As per recommended IS/REC Standard)
Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete.
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.01
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. NOTE: Please refer Pole drawings for details (As per recommended IS/REC Standard)
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Fixing of 11 kV Disc Insulator with fitting (polymer) with Pins (45 KN) (As per recommended IS/REC Standard)
Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
11/0.433 kV Distribution Transformer (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site of 11/0.433 kV Distribution Transformer.
63 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
8 Mtr. Long ST Poles (410 SP-15) (As per recommended IS/REC Standard)
Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
185mm sq Cable PVC FRLS with Al Thimbles
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV Disc Insulators (polymer) Complete with fitting (45 KN) (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Sub station earthing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm for 1 No. Neutral Earthing and through GI Strip of 25X3 mm for 2 Nos transformer body Earth, 2 Nos Pole Earth, 1 No. LA Earth and 1 No. GO handle Earth (Note: For LA Earth 1 pipe/rod shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and GI Clamps. (As per recommended IS/REC Standard)
Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
Erection/Installation, Testing and commisioning of material supplied at Sl. No-3.01
Installation of 63kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Installation of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard)
Installation of 11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
Installation of 11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Fixing of Galvanised Stay Set with 50*mm stay clamp, guy insulator ( 02Nos), Anchor Plate(200*200*6mm) nut & bolts, 02 No turn buckles 1.8mtr long 16mm diameter solid GS stay rod & 7/3.15 mm dia GI Stranded wire complete. (As per recommended IS/REC Standard).
Fixing / Crimping of 185 mm sq Cable PVC FRLS with Al Thimbles
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Installation of 11 kV Disc Insulators (polymer) Complete with fitting( 45 KN) (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
Excavation of Earthing Pits of dia = 650 mm and depth= 3000 mm, Installation and fixing of Sub station earthing as per REC approved arrangement/spacing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm 1 no for neutral earthing and 25X3 mm for 2 Nos transformer body earth, 2 Nos Pole earth, 1 no. LA Earth and 1 no. GO handle earth). (Note: For LA Earth 1 pipe shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and Clamps. Refilled with earth enhancement materials and earthing chamber made of brick masonary with RCC Slab Cover (Proper Earthing Value must be insured) (As per recommended IS/REC Standard)
Fixing of Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
LT Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Mukky clamps with LT Shackle insulators (polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-5.1
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing of GI Mukky clamps with LT Shackle insulators(polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
Description of Work / Item(s)
Amount
11 KV (HT) Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. (As per recommended IS/REC Standard)
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV DISC WITH FITTINGS( 45 KN) (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-1.01
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel Cross-arm (75 x 40x6mm) with GI Angle Braces, GI Pole Top Bracket (50x50x6 mm) including GI Back Clamps of 50X8 mm for fixing Cross arm and pole top bracket without making holes in the ST pole as per REC standard. NOTE: Please refer Pole drawings for details (As per recommended IS/REC Standard)
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Fixing of 11 kV Disc Insulator with fitting (polymer) with Pins (45 KN) (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
11/0.433 kV Distribution Transformer (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, Insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site of 11/0.433 kV Distribution Transformer.
25 kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
8 Mtr. Long ST Poles (410 SP-15) (As per recommended IS/REC Standard)
11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
120mm sq Cable PVC FRLS with Al Thimbles
11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
11 kV Disc Insulators (polymer) Complete with fitting (45 KN) (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Sub station earthing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm for 1 No. Neutral Earthing and through GI Strip of 25X3 mm for 2 Nos transformer body Earth, 2 Nos Pole Earth, 1 No. LA Earth and 1 No. GO handle Earth (Note: For LA Earth 1 pipe/rod shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and GI Clamps. (As per recommended IS/REC Standard)
Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
Erection/Installation, Testing and commisioning of material supplied at Sl. No-3.01
Installation of 63kVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Al Wound, oil filled, with LT cable termination box with detachable Aluminium Gland Plate.(As per recommended IS/REC Standard)
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Installation of 11 kV Horn, Gap Fuse Set, 3-phase, 200A (As per recommended IS/REC Standard)
Installation of 11 kV, G.O AB Switch , 3-phase, 200A (As per recommended IS/REC Standard)
Fixing / Erection of GI Channel, GI Cross Arms (100x50x6mm) / (75x40x6 mm) / GI Angles (50x50x6 mm) with 50X8 mm GI Back clamps without drilling/punching holes in the ST poles. (As per recommended IS/REC Standard)
Fixing / Crimping of 120 mm sq Cable PVC FRLS with Al Thimbles
Fixing of 11 kV Pin Insulators (polymer) with Pins (10 KN) (As per recommended IS/REC Standard)
Installation of 11 kV Disc Insulators (polymer) Complete with fitting( 45 KN) (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
Excavation of Earthing Pits of dia = 650 mm and depth= 3000 mm, Installation and fixing of Sub station earthing as per REC approved arrangement/spacing by GI Pipe 40 mm dia 4 mm wall thickness or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm 1 no for neutral earthing and 25X3 mm for 2 Nos transformer body earth, 2 Nos Pole earth, 1 no. LA Earth and 1 no. GO handle earth). (Note: For LA Earth 1 pipe shall be kept separate) with Earthing Insulators, GI Nuts, Bolts and Clamps. Refilled with earth enhancement materials and earthing chamber made of brick masonary with RCC Slab Cover (Proper Earthing Value must be insured) (As per recommended IS/REC Standard)
Fixing of Sundry Items/LT Fuse Set (As per recommended IS/REC Standard)
LT Line (Note: For detailed specifications please refer attached SBD which forms a part of the tender)
Supply, Loading, Transportation, insurance, Unloading, Carriage, Delivery at Site including handling, preservation and proper storage at site.
8 Mtr. Long ST Poles (410, SP-15) (As per recommended IS/REC Standard)
30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
GI Mukky clamps with LT Shackle insulators (polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
Galvanized Nuts and Bolts of sizes.
Erection/Installation, Testing and commisioning of material supplied at Sl. No-5.1
Erection of 8 Mtr. Long ST Poles including (410, SP-15) with pit excavation and refilling of pit complete work. (As per recommended IS/REC Standard)
Laying, stringing and binding of 30 mm2 ACSR (Weasel) Conductor with PG clamps of required size (as per site requirement) (As per recommended IS/REC Standard)
Fixing of GI Mukky clamps with LT Shackle insulators(polymer)16KN with GI back clamps to be fixed without drilling/punching of holes on ST poles. (As per recommended IS/REC Standard)
Fixing of Galvanized Nuts and Bolts of sizes.
Mohammand Shafiq
M/S TAZEEM AKTHER
New Age Construction
Mohammand Shafiq
New Age Construction
Mohammand Shafiq
New Age Construction
Mohammand Shafiq
New Age Construction
Mohammand Shafiq
Mohammand Shafiq
M/S TAZEEM AKTHER
M/S TAZEEM AKTHER
Mohammand Shafiq
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .