Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 CrAccepted-Finance VILLAGE MANDOW TEHSIL JOSHIYARA DISTRICT UTTARKASHI | UTTAR KASHI | UTTARAKHAND | 249128 | ₹3.2 Cr | 1 | Accepted-Finance l1 |
| 2 | 2₹3.2 Cr+₹40,775.85 (0.13%)Accepted-Finance BHAJAN GARH KAILASH GATE MUNI KI RETI DISTT TEHRI GARHWAL | ₹3.2 Cr+₹40,775.85 (0.13%) | 2 | Accepted-Finance l2 |
| 3 | 3₹3.2 Cr+₹1.6 L (0.50%)Accepted-Finance RANA BHAWAN WARD NO 11 POST OFFICE GYANSHU DISTT UTTARKASHI | ₹3.2 Cr+₹1.6 L (0.50%) | 3 | Accepted-Finance l3 |
| 4 | 4₹3.2 Cr+₹1.9 L (0.61%)Accepted-Finance | ₹3.2 Cr+₹1.9 L (0.61%) | 4 | Accepted-Finance l4 |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | daya sankar baluni L1 | ANAND SINGH RANA L3 | SANGAM CONSTRUCTION L2 | JNM CONSTRUCTION & ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to
50 m and lift up to 1.5 m.
2.28.1 All kinds of soil | 1,325.6 | sqm | 61,362.02 ₹61,362.02 | 61,666.91 ₹61,666.91 | 60,977.6 ₹60,977.6 Lowest | 62,303.2 ₹62,303.2 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic wxcavator) manual ,eans in foundation trenches ordrains including dressing of sides and ramming ofbottoms, lift uoto 1.5m including getting out the exavated soil anddisposal of surplus excavated soil as directed within a lead of 50m. | 1,085.17 | cum | 3,82,858.83 ₹3,82,858.83 Lowest | 3,84,779.58 ₹3,84,779.58 | 3,84,150.18 ₹3,84,150.18 | 3,85,235.35 ₹3,85,235.35 |
| 3.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materiala o fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404 By Mechanical Means | 208.41 | cum | 7,00,682.76 ₹7,00,682.76 Lowest | 7,04,202.8 ₹7,04,202.8 | 7,04,008.98 ₹7,04,008.98 | 7,04,008.98 ₹7,04,008.98 |
| 4.00 | PLAIN CEMENT CONCRETE Providing and laying in position cement concrete 1:4:8 aggregated excluding the cost of centering and shuttering-all work upto plinth leve. | 156.81 | cum | 14,47,812.62 ₹14,47,812.62 | 14,55,088.6 ₹14,55,088.6 | 13,83,377.82 ₹13,83,377.82 Lowest | 14,55,039.99 ₹14,55,039.99 |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring shuttering finishing and reinforced-All work upto plinth level 1:1.5:3 All works above plinth level upto floor V level. | 109.26 | cum | 16,07,218.97 ₹16,07,218.97 Lowest | 16,15,295.47 ₹16,15,295.47 | 16,15,190.58 ₹16,15,190.58 | 16,15,299.84 ₹16,15,299.84 |
| 6.00 | Centering shuttering including strutting propping etc. and removal of from work Columns ,Pillars,Piers, Abutments, Posts and Struts. | 174.81 | sqm | 2,27,765.19 ₹2,27,765.19 Lowest | 2,28,910.2 ₹2,28,910.2 | 2,28,826.29 ₹2,28,826.29 | 2,29,001.1 ₹2,29,001.1 |
| 7.00 | Reinforcement for R.C.C work including straighting cutting,bending,placing in position and bending all complete Themro-Mechanically Treated bars. | 35,560.38 | kg | 51,98,216.35 ₹51,98,216.35 | 52,24,175.43 ₹52,24,175.43 | 51,91,815.48 ₹51,91,815.48 Lowest | 52,27,375.86 ₹52,27,375.86 |
| 8.00 | Brick work with F.P.S bricks of class 75 in super structure above plinth level up to floor five level in all shapes and sizes in cement mortar 1:6 | 154.13 | cum | 19,02,298.66 ₹19,02,298.66 Lowest | 19,11,857.8 ₹19,11,857.8 | 19,11,828.52 ₹19,11,828.52 | 19,11,828.52 ₹19,11,828.52 |
| 9.00 | 12mm thick plaster on the plain in side of mix 1:6 mortar. | 1,072.81 | sqm | 4,84,717.01 ₹4,84,717.01 Lowest | 4,87,152.29 ₹4,87,152.29 | 4,87,055.74 ₹4,87,055.74 | 4,87,055.74 ₹4,87,055.74 |
| 10.00 | 15mm cement plaster on the rough side of single or half brick wall of mix. | 595.85 | sqm | 3,09,311.69 ₹3,09,311.69 Lowest | 3,10,866.86 ₹3,10,866.86 | 3,10,437.85 ₹3,10,437.85 | 3,10,437.85 ₹3,10,437.85 |
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
4 Jul 2026, 5:00 pmClosed
executive officer
NAGAR PALIKA PARISHAD BADHAT UTTARKASHI
CONSTRUCTION OF MRF CENTER
2026_EONPU_96778_1
831
Open Tender
Civil Works
Item Rate
WARD NO 3 TILOTH
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EO Nagar Palika Parishad
₹6.4 L
9 Jul 2026
18 Jun 2026
6 Jul 2026
18 Jun 2026
4 Jul 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to
50 m and lift up to 1.5 m.
2.28.1 All kinds of soil | 1,325.6 | sqm | 46.52 | ₹61,666.91 |
| 2 | Earth work in excavation by mechanical means (Hydraulic wxcavator) manual ,eans in foundation trenches ordrains including dressing of sides and ramming ofbottoms, lift uoto 1.5m including getting out the exavated soil anddisposal of surplus excavated soil as directed within a lead of 50m. | 1,085.17 | cum | 354.58 | ₹3,84,779.58 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materiala o fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 404 By Mechanical Means | 208.41 | cum | 3,378.93 | ₹7,04,202.8 |
| 4 | PLAIN CEMENT CONCRETE Providing and laying in position cement concrete 1:4:8 aggregated excluding the cost of centering and shuttering-all work upto plinth leve. | 156.81 | cum | 9,279.31 | ₹14,55,088.6 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring shuttering finishing and reinforced-All work upto plinth level 1:1.5:3 All works above plinth level upto floor V level. | 109.26 | cum | 14,783.96 | ₹16,15,295.47 |
| 6 | Centering shuttering including strutting propping etc. and removal of from work Columns ,Pillars,Piers, Abutments, Posts and Struts. | 174.81 | sqm | 1,309.48 | ₹2,28,910.2 |
| 7 | Reinforcement for R.C.C work including straighting cutting,bending,placing in position and bending all complete Themro-Mechanically Treated bars. | 35,560.38 | kg | 146.91 | ₹52,24,175.43 |
| 8 | Brick work with F.P.S bricks of class 75 in super structure above plinth level up to floor five level in all shapes and sizes in cement mortar 1:6 | 154.13 | cum | 12,404.19 | ₹19,11,857.8 |
| 9 | 12mm thick plaster on the plain in side of mix 1:6 mortar. | 1,072.81 | sqm | 454.09 | ₹4,87,152.29 |
| 10 | 15mm cement plaster on the rough side of single or half brick wall of mix. | 595.85 | sqm | 521.72 | ₹3,10,866.86 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
rfpmrf.pdf
Tender Documents • 3.94 MB
BOQ_114324.xls
BOQ • 0.55 MB
corrigendum1.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .