Tender Value
₹4.1 L
EMD Value
₹4,200
Closing Date
30 Jul 2026, 6:00 pm
Executive Engineer, panchayat, R & B Division, Surat.
Contructing Shed at Sarasvati Kanya Chatralaya Devgadh Ta. Mandvi Dist.Surat.
324708
05 OF 2026-27 corrigendum-1
Open
Civil Works - Others
Works
Surat
5 documents required · 5 mandatory
₹600
Executive Engineer, panchayat R & B Division, surat
₹4,200
16 Jul 2026
16 Jul 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
Name of Work:- Contructing Shed at Sarasvati Kanya Chatralaya Devgadh Ta.
Mandvi Dist.Surat.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification Rate In
Quantity Unit Amount
No. and reference to book of specifications) Figures
1 Excavation for foundation upto 1.5 m depth 7.99 Cumt 268.93
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(C) Hard Murrum
2 Filling available excavated earth (excluding 4.00 Cumt 136.92
rock in trenches plinth, slides of foundations
etc. in layers not exceeding 20 cm in depth
consolidating each deposited layer by ramming
3 Filling in foundation and plinth with murrum or 10.87 Cumt 301.78
selected soil in layers of 20cm thickness
including watering ramming and consolidating
4 Providing and laying cement concrete 1:2:4 (1- 7.69 Cumt 3741.69
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth (more than 10 ton)
5 Providing and laying controlled cement 1.55 Cumt 4640.95
concrete M.200 and curing complete the cost of
formwork but excluding reinforcement for
reinforced concrete work in (A) Foundations,
footings, Base of columns and Mass concrete.
6 Providing and laying controlled cement 0.26 Cumt 8895.82
concrete M-200 and curing complete including
the cost of form work but excluding cost of
reinforcement for reinforced concrete work for
Column upto plinth level.
7 Providing and laying controlled cement 2.11 Cumt 6367.83
concrete M.200 and curing complete the cost of
formwork but excluding reinforcement for
reinforced concrete work in (D) Columns, Pillars
posts and struts, upto floor two level.
8 Brick work using common burnt clay building 1.64 Cumt 4214.33
brick having crushing strength not less than
kg/sq. cm. in foundation and plinth in cement
mortar 1:6 ( 1 Cement: 6 fine sand) (B)
9 Providng TMT bars renforcement of FE 760.84 Kg 77.29
500/500D for R.C.C. work including bending
binding and placing in position complete for all
10 Providing and laying controlled cement 0.22 Cumt 8895.83
concrete M.200 and curing complete the cost of
formwork but excluding reinforcement for
reinforced concrete work in (D) Columns, Pillars
posts and struts, upto floor two level.
11 Brick work using common burnt clay building 2.57 Cumt 4503.05
brick having crushing strength not less than
kg/sq. cm. in super structure above plinth level
up to floor two level in cement mortar 1:6 (
Cement: 6 fine sand) (B) Convention for G.F
12 Providing 15mm thick cement plaster in single 11.40 Sqmt 211.82
coat on Rough (Similar)side of single or half
brick walls for interior plastering upto floor two
level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand)
13 20 mm thick sand faced cement plaster with on 23.40 Sqmt 315.69
wall upto all height above ground level
consisting 12 mm thick backing coat of c.m. 1:3
(1 cement : 3 sand ) and 8 mm thick finishing
coat of cm 1:1 (1 cement : 1 sand) etc.
complete.all height etc. comp
14 P & L 24" x 24" vitrified 8 mm thick tile flooring 57.60 Sqmt 1467.73
over 20 mm (average) base of cement mortar
1:6 ( 1 cement: 6 coarse sand) on new surface
or fixing on existing flooring by adhesive
material including dismentaling of existing
flooring and jointed with color cement slurry
including finised with flush pointing & cleaning
the surface etc. complete for antiskit
15 Providing Green Marble for Stair Toppa & Riser 14.10 Sqmt 2547.22
storage cabat partion,self complate with
material like cement,marble,camical etc
complate including all Labour work complate as
per drawing and direction by Site Engineer
16 Finishing wall with water proofing cement paint 11.40 Sqmt 120.27
of on wall surface ( Two coats) to give an
approved brand manufacture and of requred
shape even shade after throughtly brushing of
loose powered materials.
17 Wall painting (two coats) with plastic emulsion 23.40 Sqmt 130.65
paint of approved brand and manufacture with
on undecorated wall surface to give an even
shade including throughly brushing the surface
free from mortar droppings and other foreign
matter and sand papered smooth along ceilings
and sloping roofs.
18 Steel work, welded in built up sections framed 10.40 Qui 9375.33
work including cutting, hoisting, fixing in
position and applying a priming coat of red lead
paint. (D) In trussses and trussed purlins, upto
25 M. span and 15 M. ovarall height.
19 Providing corrugated G.I. sheet of class-3 57.67 Sqmt 734.19
roofing fixed with glavanished iron J or L
Hooks, Bolts and nuts 8mm diameter with
bitumen and G.I. limpet washer or G.I. limpet
washer. filled with white lead complete
excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works
directed by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where the reisa change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cement Standards -11-05-17 GR 2 Side.pdf
4.Tender Negotiation.pdf
5.Laboratory GR.pdf
6.GST GR.pdf
7.Steel Lap.pdf
11. Other GR.pdf
8.Clause 47 48.pdf
Cement consumption gr.pdf
GST GR 1.pdf
5.GR.pdf
4.0 tender booklet.pdf
3. SBD GR.pdf
Building Test schedule.pdf
Environment GR_11zon.pdf
BOQ Shed Kanya Ashram Devgadh.pdf
SBD.pdf
Specification.pdf
building booklet.pdf
Download all tender documents and submit your bid