| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC ARUNODAYAM H KAYANNA BAZAR PO 673525 | KOZHIKODE | KERALA | 673525 | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.4 L+₹16,170 (2.58%)Rejected-Finance KERALA KL KERALA | ALAPPUZHA | KERALA | 686534 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | N.P. KANARAN L2 | CHANDRAN.C.H L1 |
|---|---|---|---|---|---|
| 1.00-Rectification works to Perambra FB between ch 0/000 and 0/400, 0/600 and 1/000 km | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 320 | sqm | 18.39 ₹5,884.8 | 18.35 ₹5,872 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 54.83 | cum | 260.29 ₹14,270.4 | 259.36 ₹14,219.41 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 10.86 | cum | 8,017.39 ₹87,092.91 | 8,009.51 ₹87,007.31 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 225.63 | sqm | 863.52 ₹1,94,837.74 | 847.33 ₹1,91,184.76 Lowest |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 31.42 | cum | 9,040 ₹2,84,000.64 | 8,648.05 ₹2,71,687.14 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.78 | cum | 9,331.75 ₹16,657.17 | 9,322.82 ₹16,641.23 Lowest |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 128.73 | sqm | 320.61 ₹41,272.77 | 320.31 ₹41,234.15 Lowest |
Tender Value
₹5.7 L
EMD Value
₹14,285
Closing Date
13 Aug 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer KYIP O and M Sub Di
Assistant Executive Engineer KYIP O and M Sub Division peruvannamuzhi
GENERAL KyIP CADA 2025 26 Rectification works to Perambra FB between ch 0 040 and 0 220 km General Civil Work
2025_Irrig_783304_1
RR/PI/TR/2410/2025_5_5_4/1
Open Tender
Civil Works - Others
Item Rate
180 days
Perambra
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,260
Yes
₹14,285
Yes
8 Oct 2025
6 Aug 2025
16 Aug 2025
6 Aug 2025
13 Aug 2025
6 Aug 2025
Amount
-Rectification works to Perambra FB between ch 0/000 and 0/400, 0/600 and 1/000 km
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
N.P. KANARAN (BID ID -2286391)
Bidder Name
N.P. KANARAN
CHANDRAN.C.H
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1285720.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .