| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance AMBEDKAR PURAM 6 140 AWAS VIKAS SECTOT 6 KANPUR NAGAR | Admitted-Finance |
Tender Value
₹10.9 L
EMD Value
₹55,000
Closing Date
7 Feb 2020, 3:00 pmClosed
Project Manager
PROJECT MANAGER, UNIT-8, 19 MARUTIPURAM, FAIZABAD ROAD, LUCKNOW
LABOUR CHARGES FOR CONSTRUCTION OF DRAINAGE CROSSING AT KM. 4.850 AT WIDENING AND STRENTHENING OF SERVICE ROAD MAKING PUCCA METALED ROAD JANLA DY. BELAN CANAL DIVISION ALLAHABAD
2020_UPPRC_428712_2
64/PCL/PM/Unit-8/Belan Canal
Open Tender
Manpower Supply
Item Rate
90 days
Prayagraj
LABOUR CHARGES FOR CONSTRUCTION OF DRAINAGE CROSSING AT KM. 4.850 AT WIDENING AND STRENTHENING OF SERVICE ROAD MAKING PUCCA METALED ROAD JANLA DY. BELAN CANAL DIVISION ALLAHABAD
2 documents required · 2 mandatory
₹2,950
Project Manager, Unit-8
₹55,000
Lucknow
3 Jun 2020
29 Jan 2020
7 Feb 2020
29 Jan 2020
7 Feb 2020
29 Jan 2020
1 Feb 2020
Amount
Excavation other rock by cracker in foundation including all lead & lift, of labour and T&P required for proper completion of work as per direction of Engineer-In-Charge.
Earth work with dressing in making embankment by carrying earth from a distance upto 5 km by power transport and laying at proper place in layer of 20 cm thickness campacted mechanically to achieve the dry density of soil more than 97% including cost of watering etc required for proper completion of work as per direction of engineer-in-charge.
Labour charges for laying P C C 1:4:8 with coarse sand, cement Stone ballast 20 to 40 mm in size in foundation excluding cost of all materials but including labour T&P etc required for proper completion of work as per direction of Engineer-In- charge.
Labour charges for laying P.C.C 1:3:6 with coarse sand ,cement Stone ballast 20 to 40 mm in size in foundation excluding cost of all materials but including labour, T&P etc.required for proper completion of work as per direction of Engineer-In- charge.
Centering and shuttering for Concrete work including cost of all materials, labours & T&P etc.required for proper completion of work.
Labour charges for Steel reinforcement in slab,bed and wall including cutting bending,binding and placing in proper position excluding cost of steel, binding wire but including labour,and T&P etc
Labour charges for laying R.C.C 1:1:2 with coarse sand cement Stone grit 4.75 to 20 mm in size excluding cost of all materials but including labour, T&P etc. required for proper completion of work.
P/L Water stop PVC seal including cost of all materials, labours,lead,lift and T&P etc.as per direction of Engineer-in-Charge.
P/L Sealing compound for joint including cost of all materials,labours and T&P etc. required for proper completion of work as per direction of Engineer-in-charge.
P/L 300mm thick G P sheet including cost of all materials. Labours, lead, lift and T&P etc.as per direction of Engineer-in-charge.
Labour charges for laying C.C 1:1:2 for wearing coat with coarse sand, cement Stone grit 4.75 to 10 mm in size excluding cost of all materials but including labour, T&P etc. required for proper completion of work.
Labour charges for C.R. stone masonry with 1:3 C M excluding cost of all materials but including lead,lift,labours and T&P etc. complete as per direction of Engineer-in-charge.
Labour charges for laying C.C 1:2:4 with coarse sand, cement Stone grit 4.75 to 20 mm in size excluding cost of all materials but including Labour, T&P etc. required for proper completion of work.
Labour charges for laying Grouted stone pitching with 1:3 C.M excluding cost of all materials but including labour, T&P etc. required for proper completion of work.
Deep struck cement Pointing in 1:2 cement sand mortar on stone masonry including cost of all materials, labour, T&P etc. required for proper completion of work.
Two coats Bitumen painting in outer surface of box including materials, Labour, T&P etc. required for proper completion of work.
GST extra as applicable
M/S VINOD KUMAR
M/S RAM ASRAY GUPTA CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .