Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
16 Sept 2026, 4:00 pmDue today
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
Please refer BOQ
2026_RDPR_323136_100
e-NIT No. 80 REW Rajouri of 2026 Dated 25-08-2026
Open Tender
Civil Works
Percentage
30 days
RAJOURI
Please refer Tender Documents
2 documents required · 2 mandatory
₹300
Treasury Challan MH-0515
₹4,000
Yes
16 Sept 2026
3 Sept 2026
17 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Trench excavation mechanical means in exceeding 10sqm on plan, | 9.35 | Cum | 632.53 | ₹5,914.16 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) | 1.35 | Cum | 1,725.2 | ₹2,329.02 |
| 3 | Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 20 mm nominal size) | 1.56 | Cum | 4,826.5 | ₹7,529.34 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.56 | Cum | 7,104.35 | ₹18,187.14 |
| 5 | Providing and laying in position cement of M10 grade with 30% boulders including curing but excludinf the cost of centering and shuttring all work upto plainth level. | 14.98 | cum | 5,733.6 | ₹85,889.33 |
| 6 | Providing and laying of Boulders | 20.96 | cum | 716 | ₹15,007.36 |
| 7 | Steel reinforcement for R.C.C. | 256.03 | kg | 123.2 | ₹31,542.9 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Shelves (cast-in-situ) | 37.83 | sqm | 286.35 | ₹10,832.62 |
| 9 | Material Consumptions and Carriages, Carriage of Sand /Aggragates | 25.26 | cum | 638 | ₹16,115.88 |
| 10 | Add Cost Of CIB | 1 | nos | 3,000 | ₹3,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_1087606.xls
BOQ • 0.28 MB
1Techeve.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .