Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.6 L+₹182.10 (0.05%)Rejected-Finance UNNAYAN BHAWAN BLOCK A 7TH FLOOR SALT LAKE CITY KOLKATA 700091 WEST BENGAL INDIA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹3.6 L+₹182.10 (0.05%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.6 L+₹327.78 (0.09%)Rejected-Finance | ₹3.6 L+₹327.78 (0.09%) | L3 | Rejected-Finance L3 |
Tender Value
₹3.6 L
EMD Value
₹7,284
Closing Date
7 Mar 2026, 4:00 pmClosed
Chairman Kalyani Municipality
Office of the Chairman, Kalyani Municipality
Brick Work land filling work and others related work at Jheelpar side, in ward No-13, Under Kalyani Municipality.
2026_MAD_1013758_59
WBMAD/ULB/KM/NIT-17(e) /Dev/2025-2026
Open Tender
CIVIL WORKS
Percentage
90 days
Kalyani Municipality
Please Refer Tender Document
8 documents required · 8 mandatory
₹1,161
₹7,284
14 Sept 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
7 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with 1st class bricks in cement mortar (1:6) Ground Floor
(a) In foundation and plinth
Ref.Page -15, Item -8 a), PWD SOR Vol-I w. e. f. 1.11.2017 | 8.77 | Cum | 5,368.05 | ₹47,056.33 |
| 2 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) In ground floor.
Ref. Page - 16, Item 16; PWD SOR VOL-I w.e.f. 1.11.2017 | 10.72 | Sqm | 728.53 | ₹7,809.84 |
| 3 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
(a) Pakur Variety
Ref. Page -24, Item -4), PWD SOR Vol-I w. e. f. 1.11.2017 | 4.23 | Cum | 5,401.34 | ₹22,820.66 |
| 4 | Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Ref. Page -47, Item -3, PWD SOR Vol-I w. e. f. 1.11.2017 | 266.59 | Sqm | 24 | ₹6,398.16 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm thick wooden shuttering without staging
Ref. Page - 42, Item 36,f; PWD SOR VOL-I w.e.f. 1.11.2017 | 33.43 | Sqm | 209 | ₹6,986.87 |
| 6 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/Sq.M all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement
(iii) 35 mm. thick
Ref. Page -48, Item -6 ii), PWD SOR Vol-I w. e. f. 1.11.2017 | 347.79 | Sqm | 328.21 | ₹1,14,148.16 |
| 7 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion
Ref. Page -23, Item -1), PWD SOR Vol-I w. e. f. 1.12.2017 | 17.07 | Cum | 4,630.25 | ₹79,055.5 |
| 8 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (Payment to be made on measurement of finished quantity)
Ref. Page 2, Item -4A, PWD SOR Vol-I w. e. f. 1.11.2017 and P-1, Item -1, 5th CORRIGENDA & ADDENDA wef 16.04.2019 | 22.77 | %Cum | 93,621 | ₹21,31,282.07 |
| 9 | Add 18% GST | - | Sqm | 0.18 | - |
| 10 | Add 1% Cess | - | Mtrs | 0.01 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 6.17 MB
BOQ_2496216.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .