Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 CrAdmitted-Finance | +0.00% | ₹7.7 Cr | L1 | Admitted-Finance |
| 2 | L1₹7.7 CrAdmitted-Finance | +0.00% | ₹7.7 Cr | L1 | Admitted-Finance |
| 3 | L1₹7.7 CrAdmitted-Finance | +0.00% | ₹7.7 Cr | L1 | Admitted-Finance |
| 4 | L1₹7.7 CrAdmitted-Finance | +0.00% | ₹7.7 Cr | L1 | Admitted-Finance |
| 5 | L1₹7.7 CrAdmitted-Finance AT WARD NO 28 PO BHOI NAGAR PS SAHEED NAGAR DIST KHURDHA | KHURDHA | ODISHA | +0.00% | ₹7.7 Cr | L1 | Admitted-Finance |
Tender Value
₹7.7 Cr
EMD Value
₹7.7 L
Closing Date
5 May 2026, 5:00 pmClosed
Chief Construction Engineer
O/o ChiefConstructionEngineer,CentralRWCircle,BBSR
Construction of H.L. Bridge over river Prachi on Tulasipur -Chahata (Bandheswar Mahadev Temple) to Krushna Prasad Panchayat office in the District of Puri under SBY for the year 2024-25
2025_CERWI_122456_2
Tender Online C.C-36 of 2025
National Competitive Bid
Civil Works - Bridges
450 days
Nimapara
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹7.7 L
Yes
24 Jun 2026
29 Apr 2026
6 May 2026
29 Apr 2026
5 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in exacavation of foundation in all kinds of soil within initial llead and lifts including dressing and leveling the bed, shoring & shuttering etc complete and depositing the excavated earth away from the working area as per specification & direction of the Engineer-in-Charge including cost of all labour & T&P articles required for the work etc.complete in all respect. | - | Cum | 304.92 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Providing Cement concrete M-10 in pile foundation using 4cm size hard granite crusher broken metal of approved quality from approved quarry including watering, curing, side shuttering and raming with cost, conveyance, royalty, taxes of all materials, labour charges, T&P etc. required for the work complete in all respect as per specification and direction of Engineer-in-Charge.
Below Approach Slab | 8.66 | Cum | 6,769.75 | ₹58,626.04 | BI01010001010000000000000515BI0100001114 |
| 3 | Supplying,fitting & fixing in position steel cutting edge as per approved design & drawing weighing not less than 40kg. per meter including steel cladding using M.S.Angles/ rods, plates bolts & nuts/rivets complete including bending to size & shape drilling holes riveting, welding, bolting etc. complete in all respects confirming to relevant IRC codes & IS specification including cost conveyance of all materials, labour & T&P & all machineries etc. required for the work with all leads & lifts complete in position in all respects (cutting edge to be placed at the level of the bottom of well cap indicated in Drg. or 150 mm. above L.W.L. as specified in the Drg. or as per written order of the Engineer-in-Charge. | 389.76 | Qtl | 10,899.79 | ₹42,48,302.15 | BI01010001010000000000000515BI0100001117 |
| 4 | Sinking of wells in all kinds of soil other than rock as per approved drawing and technical specifications as per Section 1200 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-charge.
Upto 10.00m depth
For 7.5m dia wells | 20 | Rmt | 28,422.79 | ₹5,68,455.8 | BI01010001010000000000000515BI0100001118 |
For 6.5m dia wells | 20 | Rmt | 23,412.36 | ₹4,68,247.2 | BI01010001010000000000000515BI0100001121 | |
11th Successive Mtr. Depth
For 7.5m dia wells | 2 | Rmt | 28,803.8 | ₹57,607.6 | BI01010001010000000000000515BI0100001121 | |
For 6.5m dia wells | 2 | Rmt | 23,638.52 | ₹47,277.04 | BI01010001010000000000000515BI0100001121 | |
12th Successive Mtr. Depth
For 7.5m dia wells | 2 | Rmt | 29,184.8 | ₹58,369.6 | BI01010001010000000000000515BI0100001123 | |
For 6.5m dia wells | 2 | Rmt | 23,864.69 | ₹47,729.38 | BI01010001010000000000000515BI0100001123 | |
13th Successive Mtr. Depth
For 7.5m dia wells | 2 | Rmt | 29,565.8 | ₹59,131.6 | BI01010001010000000000000515BI0100001114 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.78 MB
Tendernotice_2.pdf
PDF • 5.54 MB
BOQ_570287.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid