| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC Agreement executed by L1 |
| 2 | L2₹3.8 Cr+₹5.2 L (1.39%)Rejected-AOC | ₹3.8 Cr+₹5.2 L (1.39%) | L2 | Rejected-AOC Agreement executed by L1 |
Tender Value
₹3.5 Cr
EMD Value
₹1 L
Closing Date
1 Aug 2020, 6:00 pmClosed
Superintending Engineer, PWD Bridges
Office of the Superintending Engineer, PWD Bridges , North Circle, Kozhikode
Construction of bridge and approach road
2020_PWD_371697_1
PWD/2020-2021/14540/BRCKKD
Open Tender
Civil Works - Bridges
Item Rate
360 days
Ottappalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
online
₹1 L
Yes
6 Jan 2021
14 Jul 2020
5 Aug 2020
14 Jul 2020
1 Aug 2020
14 Jul 2020
Amount
BRIDGE PROPER
od35037/2019_2020 : RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. ( as per OD Irrigation)
2.3.2.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
od35041/2019_2020 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete ( as per OD Irrigation)
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.1.B.2 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth 3 M to 6 M- Mechanical Means<br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means
12.1.4.A : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Hard Rock ( blasting prohibited) - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Hard Rock ( blasting prohibited) - Mechanical Means
od35065/2019_2020 : DOWEL BARS - Supplying and Providing MS dowel bars of size 25 mm dia of 2.0m long (1m in rock and 1m in concrete ) including drilling holes of 30mm dia and filling the gap with cement grout( 0.50kg/each) etc complete ( as per OD Irrigation)
12.8.G.2 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump- (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump- (Without formwork)
12.8.G.2.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
13.5.H.p.2 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br> RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.1F.2.B : "Furnishing and Placing PSC Grade M45 Using Batching Plant, Transit Mixer and Concrete Pump as per drawing and Technical Specification. <br>For T-beam & slab including launching of precast girders by launching truss upto 40 m span - Height 5m to 10m"Furnishing and Placing PSC Grade M45 Using Batching Plant, Transit Mixer and Concrete Pump as per drawing and Technical Specification.For T-beam & slab including launching of precast girders by launching truss upto 40 m span - Height 5m to 10m
14.1E.1.2.B : Furnishing and Placing PSC Grade 40 as per drawing and Technical Specification<br> For T-beam & slab Super structure - Height 5m to 10m - PSC Grade M-40 - Using Batching Plant, Transit Mixer and Concrete Pump.<br>Furnishing and Placing PSC Grade 40 as per drawing and Technical Specification For T-beam & slab Super structure - Height 5m to 10m - PSC Grade M-40 - Using Batching Plant, Transit Mixer and Concrete Pump.
14.1E.2.1.A : "Furnishing and Placing PSC Grade M40 Using Batching Plant, Transit Mixer and Concrete Pump as per drawing and Technical Specification. <br>For solid/voided slab super-structure - Height upto 5m"Furnishing and Placing PSC Grade M40 Using Batching Plant, Transit Mixer and Concrete Pump as per drawing and Technical Specification.For solid/voided slab super-structure - Height upto 5m
12.8.G.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M30 - Using Concrete Mixer - (without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M30 - Using Concrete Mixer - (without formwork)
14.2 : Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsSupplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.3 : High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical SpecificationsHigh tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
13.14 : Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
14.10 : PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
14.11 : Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
14.4 : Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.
14.9 : Drainage Spouts complete as per drawing and Technical specificationDrainage Spouts complete as per drawing and Technical specification
od35064/2019_2020 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. ( as per OD Irrigation)
od35068/2019_2020 : Providing and applying 2 coats of Epoxy Paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
14.22 : Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installationProviding and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation
13.9.A : Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification <br> Granular materialBack filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
8.8 : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
12.9.C : Providing and constructing one span service road to reach island location from one pier location to another pier locationProviding and constructing one span service road to reach island location from one pier location to another pier location
Appendix:B. APPROACH ROAD
12.1.B.1 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. <br> Ordinary Soil - Depth upto 3m - Mechanical Means <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
2.1.1 : Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit.<br> Girth from 300 mm to 600 mmCutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm
2.3.2.B : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of thorny jungle - By Mechanical Means<br>Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.G.2.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
12.8.2.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump
12.8.1.C : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.G.p.2 : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br> RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump
13.5.A : Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications <br> PCC Grade M15 - Height upto 5m <br>Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M15 - Height upto 5m
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.1B.1.1.A : Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing and Technical Specification. <br> For solid slab super-structure - Height upto 5mFurnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing and Technical Specification. For solid slab super-structure - Height upto 5m
14.2 : Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsSupplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
od35064/2019_2020 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. ( as per OD Irrigation)
13.10 : Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
3.16 : Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3.17 : Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
M KUNHIMUHAMMED
Bidder Name
M KUNHIMUHAMMED
AMMU INFRASTRUCTURES PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_526283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .