Executive engineer Panchayat Irrigation Division Valsad
Repair to water harvesting structure Village :- Astol, Taluka: Kaprada , District : Valsad
317115
02 of 2026-27
Open
Civil Works
Valsad
9 documents required · 8 mandatory · 1 optional
₹600
Executive Engineer panchayat Irrigation Division Valsad
₹5,000
25 Jun 2026
25 Jun 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
Name of work: Repair to water harvesting structure Village :- Astol, Taluka : Kaprada , District : Valsad
Memorandum Schowing the item of work to be carried out
Qty. Unit Description of Item In figures Amount
Item No. 1:-Dismentalling of the existing
foundation concrete including disposing the (Rupees One
dismentalled stuff including sorting out & Thousand One
11 CM stacking the usuful materials & removing the 1165.2 Hundred Sixty Five
debries & making good the damage and Twenty Paisa
etc.complete as directed. (b) In Cement Only)
Item No. 2:-Excavation for foundation in all
sorts of soil inclunding sandy and gravelly soil
soft and hard murrum etc , dry condistion
inclunding depositing the excavated stuff in (Rupees Eighty
unifrorm layer in banks or as directed etc . 81.50 One and Fifty Paisa
Complete for lead up to 1.0 KM , and lift . (by Only)
machinary ) (a) Above water table
Item No. 3:- Excavation for foundation in soft
rock inclunding depositing the excavated stuff (Rupees One
in unifrorm layer in banks or as directed etc . Hundred Fifty Four
Complete for lead up to 1.0 KM , and lift . (by and Ten Paisa
machinary ) (a) Above water table Only)
Item No. 4:- Providing and laying plain /
Reinforced cement concrete of cement , sand (Rupees Four
and metal (12 mm to 20 mm ) size in following Thousand Eight
92.00 CM proportion Laid in situ inclunding centering and 4891.30 Hundred Ninety
shuttering , temping , smooth finising , curing One and Thirty
etc. Complete as directed for for all lead and Paisa Only)
Lifts (ii) 1:2:4
Item No. 5:-Providing and fixing M.S. Gate
with all Hoisting and Finishing arrangements as
per Design and Dimension with necessary two (Rupees Six
4.95 SM coats of oil paints etc complete (a) without 6400.00 Thousand Four
frame with 3 mm plate for gate as per Drawing. Hundred Only)
(Rupees Four Lakh Ninety Six Thousand Nine Hundred Thirty Four and Thirty Paisa Only)
I/We am/are Willing to carry out the work at……………………………...…………………% above/below Percent(should be written in figures and
words) of the estimated rates mentioned above.Amount of my/our tender works out as under.
Estimated amount Put ter Rs.
Deduct…….%below Rs. Add…….% above Rs.
Net Rs. Net Rs.
In words…………………….. In words……………………..
*(Please strike out whichever is not applicable)
Note 1 All works shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0lJhGGL ALÒ BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note-2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his
GM\WvZ VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL S\8=FS8Z[ 5MTFGL ;CL SZJLP
Note-3 Rates quotes include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions,
site, moisture, weather etc.
GM\Wv# 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5]~ YFI T[ JBT[f NZ[S ZLT[ ;FO;}OL SZJFGM ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4 E[H4 CJFDFG JU[Z[ C[9/ SFD DF8[ VD,DF\ ZC[X[P
Note-4 To be continued on additional sheets, if found necessary.
GM\Wv$ H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
Note-5 All the Rates are included 1 % Labour Cess & shall be deducted from contractor all bills.
Deputy Executive Engineer, Executive Engineer,
Tribal Area Sub Division Panchayat Irrigation Division,
Dharampur Valsad.
Signature of contractor
Name of work : Repair to water harvesting structure Village :- Astol, Taluka : Kaprada , District : Valsad
CEMENT & STEEL CONSUMPTION
Sr. No. Item Cement Required
in CM consumption
1 Item No. 4:- Providing and laying plain / Reinforced
cement concrete of cement , sand and metal (12 mm to
20 mm ) size in following proportion Laid in situ
92.00 6.40 Bags / CM
inclunding centering and shuttering , temping , smooth
finising , curing etc. Complete as directed for for all
lead and Lifts (ii) 1:2:4
Deputy Executive Engineer
Tribal Area Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD Astol.pdf
2.schedule B Astol.pdf
3.Nivida No. -02 Of 2026-27.pdf
4. ANEXURE-II.pdf
5.clause No 4.5.4 and 4.5.5.pdf
6.qualification information 1.1 to1.14 and 3.1 - Copy.pdf
7.Bid Capacity.pdf
Download all tender documents and submit your bid