Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.2 LAdmitted-Finance | ₹64.2 L | L1 | Admitted-Finance |
| 2 | L2₹69.5 LAdmitted-Finance | ₹69.5 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY NOT SUITABLE |
| Sl No | Description | Qty | Unit | CHAITANYA MAJHI L2 | wintech Developers Pvt Ltd, L1 |
|---|---|---|---|---|---|
| 1.00PREVENTIVE MAINTENANCE OF ROTATING EQUIPMENTS NAMELY PUMPS, BLOWERS, CHILLER COMPRESSORS, AIR COMPRESSORS, WORKSHOP MACHINES, PLUNGER PUMPS, MECHANICAL BOOSTERS AND DIAPHRAGM PUMPS. | |||||
| 1.10 | PM1 as per attached Annexure-A of Technical specification. | 258 | No | 7,350 ₹19.0 L | 1,900 ₹4.9 L |
| 1.20 | PM2 as per attached Annexure-B of Technical specification. | 125 | No | 5,280 ₹6.6 L | 3,050 ₹3.8 L |
| 1.30 | PM3 as per attached Annexure-C of Technical specification. | 57 | No | 4,580 ₹2.6 L | 7,000 ₹4.0 L |
| 1.40 | PM4 as per attached Annexure-D of Technical specification. | 74 | No | 5,280 ₹3.9 L | 9,800 ₹7.3 L |
| 2.00Maintenance/Overhauling | |||||
| 2.10 | Maintenance/Overhauling of Vacuum pump as per s.no. 2.1-3 of technical specification. | 120 | No | 1,500 ₹1.8 L | 10,200 ₹12.2 L |
| 2.20 | Maintenance/Overhauling of Pump as per s.no. 2.1-3 of technical specification. | 36 | No | 1,850 ₹66,600 | 10,000 ₹3.6 L |
| 2.30 | Maintenance/Overhauling of Air/N2/Chillers Compressors as per s.no. 2.1-3 of technical specification. | 10 | No | 2,550 ₹25,500 | 9,800 ₹98,000 |
| 2.40 | Maintenance/Overhauling of Cooling tower as per s.no. 2.4 of technical specification. | 2 | No | 1,850 ₹3,700 | 21,000 ₹42,000 |
Tender Value
₹66.2 L
EMD Value
₹1.3 L
Closing Date
7 Jan 2026, 2:30 pmClosed
OSD, HEAVY WATER BOARD FACILITIES TALCHER
HEAVY WATER BOARD FACILITIES, TALCHER, VIKRAMPUR, ANGUL, ODISHA- 759106
Assistance in mechanical maintenance of machines and equipments at existing facilities of Heavy Water Board Facilities, Talcher for the Year 2026-27.
2025_HWB_891461_1
HWBF/TAL/MECH/2025/23
Open Tender
Machineries/ Mechanical Engg Items
365 days
HWBF TALCHER
AS PER NIT DOCUMENTS
6 documents required · 6 mandatory
₹0
₹1.3 L
3 Feb 2026
29 Dec 2025
9 Jan 2026
29 Dec 2025
7 Jan 2026
29 Dec 2025
29 Dec 2025 - 31 Dec 2025
PREVENTIVE MAINTENANCE OF ROTATING EQUIPMENTS NAMELY PUMPS, BLOWERS, CHILLER COMPRESSORS, AIR COMPRESSORS, WORKSHOP MACHINES, PLUNGER PUMPS, MECHANICAL BOOSTERS AND DIAPHRAGM PUMPS.
PM1 as per attached Annexure-A of Technical specification.
PM2 as per attached Annexure-B of Technical specification.
PM3 as per attached Annexure-C of Technical specification.
PM4 as per attached Annexure-D of Technical specification.
Maintenance/Overhauling
Maintenance/Overhauling of Vacuum pump as per s.no. 2.1-3 of technical specification.
Maintenance/Overhauling of Pump as per s.no. 2.1-3 of technical specification.
Maintenance/Overhauling of Air/N2/Chillers Compressors as per s.no. 2.1-3 of technical specification.
Maintenance/Overhauling of Cooling tower as per s.no. 2.4 of technical specification.
Maintenance of Mechanical seal as per s.no. 2.5 of technical specification.
Maintenance of valves as per s.no. 2.6 of technical specification.
Maintenance of flanges as per s.no. 2.7 of technical specification.
Routine checkup of department vehicle on daily basis as per s.no. 3.0 of technical specification.
Material handling inside the plant premises by operation of forklift / hydra crane on daily basis as per s.no. 4.0 of technical specification.
Cleaning of department vehicles, OSRV, Pump on daily routine basis as per s.no. 5.0 of technical specification.
Weekly basis test run, check witness from mechanical point of view (Minor in nature) as per s.no. 6.0 of technical specification.
Report generation of plant equipment, maintain history book, hydrotest documents, ISI reports, material sorting and record preparation as per s.no. 7.0 of technical specification.
Supply of DA full cylinder as per s.no. 8.0 of technical specification.
Supply of Argon cylinder as per s.no. 8.0 of technical specification.
Supply of Oxygen cylinder as per s.no. 8.0 of technical specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.80 MB
Tendernotice_2.pdf
PDF • 0.04 MB
Tendernotice_3.pdf
PDF • 0.34 MB
BOQ_937009.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid