| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.5 LAccepted-AOC | ₹14.5 L | 1 | Accepted-AOC ACCEPT |
| 2 | 2₹14.9 L+₹40,811 (2.82%)Rejected-Finance | ₹14.9 L+₹40,811 (2.82%) | 2 | Rejected-Finance 2 |
| 3 | 3₹15.0 L+₹47,060 (3.25%)Rejected-Finance | ₹15.0 L+₹47,060 (3.25%) | 3 | Rejected-Finance 3 |
| 4 | 4₹15.0 L+₹50,646 (3.50%)Rejected-Finance | ₹15.0 L+₹50,646 (3.50%) | 4 | Rejected-Finance 4 |
| 5 | 5₹15.4 L+₹95,627 (6.60%)Rejected-Finance | ₹15.4 L+₹95,627 (6.60%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | VIPIN KUMAR SHARMA L2 | MITTAL BROTHERS L4 | M/s Amit Raghav L11 | LANDMARK INFRA PROJECTS L6 | PRAGYA CONSTRUCTION L1 | M/S PRABHAT CONTRACTOR AND ENGINEERS L7 | M/S GIRAND SINGH CONTRACTOR L3 | KISAAN EICHER TRACTORS L5 | M/S DEEN DAYAL CONTRACTOR L10 | S F INFRA PROJECTS L9 | M/S SHIVAM SINGH CONTRACTOR L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 507 | Cum | 60 ₹30,420 | 40 ₹20,280 Lowest | 75 ₹38,025 | 50 ₹25,350 | 73 ₹37,011 | 50 ₹25,350 | 75.5 ₹38,278.5 | 78 ₹39,546 | 90 ₹45,630 | 60 ₹30,420 | 50 ₹25,350 |
| 2.00 | Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 58 | Cum | 4,500 ₹2,61,000 | 4,200 ₹2,43,600 | 5,300 ₹3,07,400 | 3,000 ₹1,74,000 Lowest | 4,423.8 ₹2,56,580.4 | 3,900 ₹2,26,200 | 4,527 ₹2,62,566 | 4,680 ₹2,71,440 | 3,000 ₹1,74,000 Lowest | 5,000 ₹2,90,000 | 4,000 ₹2,32,000 |
| 3.00 | Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 253 | Cum | 4,300 ₹10,87,900 | 4,600 ₹11,63,800 | 5,200 ₹13,15,600 | 5,200 ₹13,15,600 | 4,155.45 ₹10,51,328.85 Lowest | 5,200 ₹13,15,600 | 4,303.5 ₹10,88,785.5 | 4,439 ₹11,23,067 | 5,500 ₹13,91,500 | 5,000 ₹12,65,000 | 5,200 ₹13,15,600 |
| 4.00 | 12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 255 | Sqm | 150 ₹38,250 | 100 ₹25,500 Lowest | 180 ₹45,900 | 100 ₹25,500 Lowest | 143.26 ₹36,531.3 | 130 ₹33,150 | 151 ₹38,505 | 152 ₹38,760 | 321 ₹81,855 | 150 ₹38,250 | 100 ₹25,500 Lowest |
| 5.00 | C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 5.25 | Cum | 7,200 ₹37,800 | 5,500 ₹28,875 | 6,500 ₹34,125 | 4,000 ₹21,000 Lowest | 5,462.1 ₹28,676.03 | 6,000 ₹31,500 | 5,561.1 ₹29,195.78 | 5,835 ₹30,633.75 | 7,500 ₹39,375 | 6,500 ₹34,125 | 6,000 ₹31,500 |
| 6.00 | Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 337 | Cum | 100 ₹33,700 | 50 ₹16,850 Lowest | 99 ₹33,363 | 100 ₹33,700 | 113.15 ₹38,131.55 | 50 ₹16,850 Lowest | 112.72 ₹37,988.32 | 120 ₹40,440 | 120 ₹40,440 | 100 ₹33,700 | 70 ₹23,590 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
22 Aug 2025, 12:00 pmClosed
Executive Engineer
U.M.B.C.D.G.C. Khurja
Construction of Retaining wall
2025_UPIDC_1065054_13
08/E.E./2025-26
Open Tender
Civil Works
Item Rate
90 days
U.M.B.C.D.G.C. Khurja
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,054
₹40,000
7 Oct 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
Amount
Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
VIPIN KUMAR SHARMA (BID ID -5449371)
M/S GIRAND SINGH CONTRACTOR (BID ID -5468073)
MITTAL BROTHERS (BID ID -5466026)
KISAAN EICHER TRACTORS (BID ID -5470717)
LANDMARK INFRA PROJECTS (BID ID -5469770)
M/S PRABHAT CONTRACTOR AND ENGINEERS (BID ID -5466318)
M/S SHIVAM SINGH CONTRACTOR (BID ID -5469260)
S F INFRA PROJECTS (BID ID -5459862)
M/S DEEN DAYAL CONTRACTOR (BID ID -5470152)
M/s Amit Raghav (BID ID -5469939)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .