OFFICE OF THE EXECUTIVE ENGINEER, AMRELI IRRIGATION DIVISION,AMRELI
Deepening work of Shell Dedumal Irrigation Scheme
285660
23 (SBD) of 2025-26
Open
Civil Works - Water Works
Amreli
12 documents required · 5 mandatory · 7 optional
₹3,600
Yes
Executive Engineer, Amreli Irrigation Division,Amreli
₹2.0 L
Yes
12 Mar 2026
12 Mar 2026
12 Mar 2026
6 Apr 2026
12 Mar 2026
Name Of Work :- Deepening work of Shell Dedumal Irrigation Scheme.
DescriptionofItem(withbrief
specification and reference to Quantity Unit Amount
book of specifications)
Excavation for deepening of
pond/check dam etc. completed as
1 per instruction of engineer in charge. 99778.20 Cum 37.40
Excavation for deepening of
pond/check dam including
deposiing excavated material Lead 232815.80
2 up to 1 Km. With all lift.etccomplited Cum
as per instruction of engineer in
I/Weam/arewillingtocarryouttheworkat… .............................. %above/belowpercent(Should
bewritteninfiguresandwords)oftheestimatedratementionedabove.Amountofmy/our tender
works out as under.
Estimatedamountputto tender Estimatedamountputto tender
Deduct………%below Add………%Above
Inwords Inwords
(B)ForItemRateTender(ForaboveINR50Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
andreferencetobookof In In
specifications) figures Words
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)……………………………… (in
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work
asdirected by the Engineer-In-Charge for which no extra payment shall be made.
2 Thelaborcesswillbe deductedasperprevailingrulesi.e.1%ofthework done.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsof bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate i.e5449.00 /M.Tmentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Irrigation Sub Division Amreli Irrigation Division
Savarkundla Amreli
Sign of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Deepening work of Shell Dedumal.pdf
BOQ Deepening work of Shell Dedumal.pdf
Shell Dedumal Techanical Specification.pdf
Tender Notic No.23 of 2025-26.pdf
Download all tender documents and submit your bid