Loading…
Loading…
Tender ID
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
6 Apr 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER, AMRELI IRRIGATION DIVISION,AMRELI
Deepening work of Shell Dedumal Irrigation Scheme
285660
23 (SBD) of 2025-26
Open
Civil Works - Water Works
Works
Amreli
12 documents required · 5 mandatory · 7 optional
₹3,600
Yes
Executive Engineer, Amreli Irrigation Division,Amreli
₹2.0 L
Yes
12 Mar 2026
12 Mar 2026
12 Mar 2026
6 Apr 2026
12 Mar 2026
Name Of Work :- Deepening work of Shell Dedumal Irrigation Scheme.
DescriptionofItem(withbrief
specification and reference to Quantity Unit Amount
book of specifications)
Excavation for deepening of
pond/check dam etc. completed as
1 per instruction of engineer in charge. 99778.20 Cum 37.40
Excavation for deepening of
pond/check dam including
deposiing excavated material Lead 232815.80
2 up to 1 Km. With all lift.etccomplited Cum
as per instruction of engineer in
I/Weam/arewillingtocarryouttheworkat… .............................. %above/belowpercent(Should
bewritteninfiguresandwords)oftheestimatedratementionedabove.Amountofmy/our tender
works out as under.
Estimatedamountputto tender Estimatedamountputto tender
Deduct………%below Add………%Above
Inwords Inwords
(B)ForItemRateTender(ForaboveINR50Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
andreferencetobookof In In
specifications) figures Words
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)……………………………… (in
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work
asdirected by the Engineer-In-Charge for which no extra payment shall be made.
2 Thelaborcesswillbe deductedasperprevailingrulesi.e.1%ofthework done.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsof bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of
input rate i.e5449.00 /M.Tmentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Irrigation Sub Division Amreli Irrigation Division
Savarkundla Amreli
Sign of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Deepening work of Shell Dedumal.pdf
BOQ Deepening work of Shell Dedumal.pdf
Shell Dedumal Techanical Specification.pdf
Tender Notic No.23 of 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .