Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC 37 MOHAN VATIIKA ACHIEVERS HOME PUBLIC SCHOOL WALI GALI JAGJEETPUR KANKHAL HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | ₹1.7 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹1.7 Cr+₹1.8 L (1.04%)Rejected-Finance HARIDWAR | ₹1.7 Cr+₹1.8 L (1.04%) | L2 | Rejected-Finance not Qualified |
| 3 | L3₹1.8 Cr+₹3.5 L (2.06%)Rejected-Finance 518 4 SAINI COLONY ROORKEE | ₹1.8 Cr+₹3.5 L (2.06%) | L3 | Rejected-Finance not Qualified |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
26 May 2025, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Replacement of existing 11 KV ACSR conductor with 11 KV AAAC, AL-59 99 sq.mm covered conductor of 11 KV Gadighat under EDD Kotdwar on semi-Turnkey Basis
2025_UPCL4_83781_1
Tender no.01/EDC(s)/2025-26
Open Tender
Electrical Works
Turn-key
180 days
Srinagar
Replacement of existing 11 KV
ACSR conductor with 11 KV
AAAC, AL-59 99 sq.mm
covered conductor of 11 KV
Gadighat under EDD
Kotdwar on semi-Turnkey
Basis
3 documents required · 3 mandatory
₹11,800
EE ETD Srinagar Garhwal
₹3.4 L
21 Jul 2025
9 May 2025
27 May 2025
9 May 2025
26 May 2025
9 May 2025
Amount
Material
Stay Clamp for SP-55 with nut & bolt
Supply of PP & Clamp for SP 55 with Nut & Bolts
IPC with Al bail for earthing
11 kv cable ties for Pin Insulator
11 kv IPC for covered to covered conductor
11 kv IPC for covered to Bare conductor
11 kv mid span jointing kit
Supply af 11 KV AAAC, AL 59 (99 sqmm Covered Conductor)
11 kv tension with bail & IPC
Bracing clamp Top for SP-55 with N&B
Bracing clamp Bottom for SP-55 with N&B
Stay Clamp for SP-33 with nut & bolt
PP & clamp with N&B ST Pole SP-23
Bracing clamp Bottom for SP-23 with N&B
Labour
Chemical earthing
Fabrication of steel
Excavation of Pit for stay set
Erection of 11 kv stay set
Grouting of stay set
Excavation of Pit for Pole
Erection of single SP-33 Pole
Erection of single SP-55 Pole
Muffing of Pole
Dismantling of 11 kv line (Weasel)
Dismantling of 11 kv line (Rabbit)
Painting of SP-55 Pole
Erection of Bracket in 11 KV Line
Lopping & Chopping of tree branches
Cartage SP-33 pole 0-20 km
Cartage SP-55 pole 0-20 km
Cartage of petty material 0-20 km
Head load of cartage SP-33 Pole 0-1Km
Head load of cartage SP-55 Pole 0-1Km
Head load of petty material 0-1 km
Disconnection & Reconnection of Consumer
Dismantling & Reinstall of Street Light
Dismantling of AB Cable
Laying of LT XLPE AB Cable 3x95+1x70 sq.mm
Laying of LT XLPE AB Cable 3x25+25 sq.mm
Dismantling of LT XLPE AB Cable 3x25+25 sq.mm
Dismantling of LT DB 3 Phase for LT AB Cable
Inst. Of Danger Board/Number Plate
Cleaning of Carbonized Pole
Back cartage of petty material 71-100 Km
Fixing of IPC with AL bail for earthing
Jumpering of D/P TPMO, Fuse set and T/f
Relignment of Tilted Pole
Fixing of 11kv 90kn tension clamp
Fixing of 11 KV Suspension Ties
Fixing of 11 kv mid span jointing kit
Jumper section Pole
Fixing of 11 kv IPC for covered - covered
Fixing of 11 kv IPC for covered - bare
Fixing of PP & Clamp with N&B for SP-55
Fixing of Disc Insulator for AAAC Conductor
Fixing of 11 Kv Pin Insulator
Supply & fixing of Anti Climbing Device
Laying spreading, Stringing AAAC conductor
Sagar Engineering Company (BID ID -382210)
VIKAS ELECTRICALS AND CONSTRUCTION (BID ID -382035)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .