Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.3 L+₹83.37 (0.01%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹8.4 L
EMD Value
₹16,886
Closing Date
18 Mar 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DISTRICT ENGINEER
ZILA PARISHAD CHAIBASA
CONSTRUCTION OF 4 X 4 RCC PULIYA AT MOTILAL KHET AT GRAM GULRUBA PANCHAYAT TARKATKOCHA BLOCK GOILKERA WEST SINGHBHUM DISTRICT
2026_ZPWSS_111146_1
ZP/CHAIBASA/08/2025-26 Gr-16
Open Tender
Civil Works
Works
60 days
GOILKERA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,250
Yes
₹16,886
Yes
13 Nov 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structuers as per drawing and technical specifications Clause 305.1 includding setting out costruction of shoring and harding removale of stumps and other delerious material and disposal uoto a lead of 50 m. do…do..all S.O.R Item No 3.13 (i) A Abut 1 x 9.00 M x 4.250 M X 1.50 M = 57.375 M3 R/W 4 x 2.00 M x 1.625 M X 1.50 M = 19.50 M3 | 110.43 | M3 | 316.2 | ₹34,918.28 |
| 2 | Sand Filling in foundation trenches as per drawing & technical specification.
S.O.R Item No. 12.03
Abut 1 x 9.00 M x 4.250 M X 0.100 M = 3.825 M3 R/W 4 x 2.00 M x 1.625 M X 0.100 M = 1.30 M3 | 7.36 | M3 | 884.36 | ₹6,508.89 |
| 3 | Providing and laying of dry rubble fiooring complete as per drawing and Technical Specification Clause 1303.3 S.O.R Item No 16.09 Abut 1 x 8.85 M x 3.800 M X 0.15 M = 5.04 M3 R/W 4 x 2.00 M x 1.625 M X 0.15 M = 1.950 M3 U/ Flo 1 x 6.700 M x 0.800 M X 0.15 M = 0.80 M3 | 11.2 | M3 | 2,427.5 | ₹27,188 |
| 4 | Plain /Reinforced cement concrete in open foundation complite as per drawing and Technical Specification (P.C.C Grade M15 ) S.O.R Item No 12.08 A Abut 1 x 8.85 M x 3.800 M X 0.20 M = 6.73 M3 R/W 4 x 2.00 M x 1.625 M X 0.20 M = 2.60 M3 Floor 1 x7.500 M x 1.00 M X 0.15 M = 1.13 M3 | 15.03 | M3 | 4,956.23 | ₹74,492.14 |
| 5 | Stone massonary work in cement mortar in foundation complete as per drawing and Technical Specification
Square Rubble Coarse Rubble massonary in C.M (1:3 ) in Foundation S.O.R Item No 12.07 A Abut 2 x(8.70+7.65)/2 x(1.675+1.15)/2x1.05=24.25M3 R/W 4 x 2 ( 1.475 + 0.95 ) / 2 x 1.05 M =10.19 M3 Cur/W 2 (0.30+1.16/2x(0.85+0.40)/2x0.90M = 0.82 M3 | 50.65 | M3 | 4,853.39 | ₹2,45,824.2 |
| 6 | Stone massonary work in cement mortar in sub-structure complete as per drawing and Technical Specification . Coarse Rubble massonary in C.M (1:3 ) in sub- structure S.O.R Item No 13.04 B Abut 2 x 7.5 x (1.00 +0.70)/2 x0.800M=10.20M3 R/W 4x(2.00+2.375 )/2x(0.80+0.40)/2x1.85M=9.71 M3 Parapet 2 x 2.400 x 0.40 x 0.50 M= 0.96 M3 | 29.98 | M3 | 4,998.06 | ₹1,49,841.84 |
| 7 | Plain /Reinforced cement concrete in sub-structure complite as per drawing and Technical Specification (P.C.C Grade M15 ) S.O.R Item No 13.05 A (p) R/W 4 x 2.375 M x0.400 M X 0.100 M = 0.38 M3 Parapet 2 x 2.400 M x 0.40 M X 0.100 M = 0.19 M3 | 0.82 | M3 | 4,948.03 | ₹4,057.38 |
| 8 | Plain /Reinforced cement concrete in sub-structure complite as per drawing and Technical Specification (P.C.C Grade M20 in Abut cap ) S.O.R Item No 13.05 B (p) Abut Cap 2 x 7.50 M x0.700 M X 0.200 M = 2.10 M3 . 2 x 7.50 M x 0.40 M X 0.285 M = 1.71 M3 | 5.47 | M3 | 5,414.59 | ₹29,617.81 |
| 9 | Plain /Reinforced cement concrete in sub-structure complite as per drawing and Technical Specification (P.C.C Grade M25 in Deck slab ) S.O.R Item No 13.5 F Case I(p) . 1 x 7.50 M x 1.60 M X 0.210 M = 2.52 M3 | 3.62 | M3 | 5,905.44 | ₹21,377.69 |
| 10 | Providing and laying cement concrete Werain coat M30 grade including Reinforcement complite as per drawing and Technical Specification S.O.R Item No 14.4 . 1 x 7.50 M x 1.60 M X 0.075 M = 0.90 M3 | 1.29 | M3 | 12,215.13 | ₹15,757.52 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_150144.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
NIT08.pdf
Tender Documents • 1.12 MB
BOQ_150144.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .