Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L Quoted ₹7.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.4 LRejected-AOC | ₹7.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ATHULKRISHNA L1 | Unnikrishnan T R L2 |
|---|---|---|---|---|---|
| 1.00Road work | |||||
| 1.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 11.75 | cum | 873.93 ₹10,268.68 | 881.95 ₹10,362.91 |
| 1.00 | 3.1:Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres. | 10.2 | cum | 515.53 ₹5,258.41 | 520.26 ₹5,306.65 |
| 1.00 | OD80503/2025-2026:Dry rubble masonry using Dpt. rubble for foundation as per drawing and technical specification | 7.3 | cum | 2,055.09 ₹15,002.16 | 2,073.94 ₹15,139.76 |
| 1.00 | OD80589/2025-2026:Dry rubble masonry ( Coursed/ Uncoursed) | 25.44 | cum | 4,255.55 ₹1.1 L | 4,294.59 ₹1.1 L |
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 4 | cum | 844.91 ₹3,379.64 | 852.68 ₹3,410.72 |
| 1.01 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 23.68 | cum | 68.82 ₹1,629.31 | 69.45 ₹1,644.23 |
| 1.01 | 13.9.A:Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material | 20.4 | cum | 3,146.82 ₹64,195.13 | 3,175.69 ₹64,784.08 |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 6.2 | cum | 7,987.59 ₹49,483.12 | 8,060.87 ₹49,937.09 |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 17.25 | cum | 9,252.92 ₹1.6 L | 9,337.81 ₹1.6 L |
Tender Value
₹6.8 L
EMD Value
₹16,882
Closing Date
17 Oct 2025, 6:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER PWD ROADS SUB DIVISIO
ASSISTANT EXECUTIVE ENGINEER PWD ROADS SUB DIVISION THRISSUR
Reconstruction of damaged culvert
2025_PWD_804818_1
05/2025-26/AEE/TSR
Open Tender
Civil Works - Roads
90 days
CHERPU
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,490
Yes
₹16,882
Yes
4 Mar 2026
3 Oct 2025
21 Oct 2025
3 Oct 2025
17 Oct 2025
3 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.05 MB
Tender Documents
Tender Documents • 0.70 MB
BOQ
BOQ • 0.31 MB
Download all tender documents and submit your bid